Railpage Australia™
  
The premier Australian rail server - wasting time and bandwidth since 1992!
 
home
news
discussions
content
site

technical support
Need Help? Lodge a support ticket!

Note: This is for technical support only. General questions about railways should be posted to the Forums.
donation
Donate using PayPal
Please Donate!
photo comp
Have YOU voted yet on Photo of the Month?

Click Here!

Voting Closes 30/11
search


 
faqsearchusergroups profileLog in

Track train in Echuca

Post new thread Reply to thread Railpage Australia™ Forum Index -> Victoria
Page 1 of 3   [ Previous thread ] :: [ Next thread ] Goto page 1, 2, 3  Next

Author Message
echboi Station Master   Joined: Mar 11, 2008
Last Visited: Jun 24, 2008
Location: sitting in a v/locity NOT travelling at 160 kmh


contact

post
Posted: Tue Apr 22, 2008 12:07 pm
I'm a local so I should know, but I don't. So what the hell is going on. Yesterday i was going for a walk around town when I hear a diesel loco coming. I knew it wouldn't be a N pass service because we only get vLoc's in echcua. so I waited around to see wtf was going on and there was T377 and T367 push-pulling a rake of about 5 flat cars with long sections of track on them. please tell me what is happening!!!
 
s
echboi Station Master   Joined: Mar 11, 2008
Last Visited: Jun 24, 2008
Location: sitting in a v/locity NOT travelling at 160 kmh


contact

post
Posted: Tue Apr 22, 2008 12:11 pm
never mind

http://www.dpc.vic.gov.au/domino/Web_Notes/newmedia.nsf/955cbeae7df9460dca256c8c00152d2b/ed21031bdaf5a117ca25723e00086735!OpenDocument

its a stabling yard
 
s
wongm Minister for Railways   Joined: May 26, 2005
Last Visited: Nov 20, 2008
Location: Geelong, Victoria


contact

post
Posted: Tue Apr 22, 2008 1:59 pm
The stabling yard for Echuca will probably just be a big barbed wirefence around an existing siding. Over the past few months there has been a number of rail trains running from Bendigo - I believe they are picking up redundant rail from the Melbourne - Bendigo bit (upgraded under the Regional Fast Rail project) and then moving it to the Echuca and Swan Hill lines, to replace the older rail there.

There are number of photos of the train at this site:
http://gunzelgallery.fotopic.net/c853138.html



Marcus Wong

Railway Pics (and the chaff) Updated November 20th
Youtube videos
Rail Geelong: History of Geelong's Railways. Victoria's real Main Line.
 
s
J-C Chief Commissioner   Joined: Jul 16, 2006
Last Visited: Nov 20, 2008
Location: Victoria


contact

post
Posted: Tue Apr 22, 2008 6:09 pm
They left Bendigo at 0910 today and returned into Bendigo at 1445.



Formally known as HHHHH





CMPS member.
 
s
kuldalai Chief Commissioner   Joined: Jan 14, 2003
Last Visited: Nov 20, 2008


contact

post
Posted: Tue Apr 22, 2008 7:55 pm
The Bendigo - Echuca line is 94lb jointed as far as Rochester, and much older 80lb jointed rail from Rochester onto Echuca .

The Bendigo - Swan Hill line is 94lb jointed as far as Kerang, and older 80lb jointed rail Kerang - Swan Hill .

The reclaimed 94lb rail re-claimed from the RFR upgrades would be being used to upgrade by relaying the 80lb old rail with reasonably young 94lb rail between Kerang and Swan Hill and between Rochester and Echuca .

After these sort of track upgrade works even with jointed rail and adequate ballast and tie renewal 100 kmh should be achievable for DMU on the Echuca line (currently 75kmh), and 100kmh Kerang - Swan Hill for loco hauled (currently 90 kmh). If the tracks were continuously welded then even higher speeds should be achievable like 115 kmh loco hauled to Swan Hill, and 115 kmh DMU to Echuca .
 
s
per1 Junior Train Controller   Joined: Jul 24, 2006
Last Visited: Nov 17, 2008


contact

post
Posted: Tue Apr 22, 2008 9:34 pm
When will this work begin. And will trains start doing these speeds?
 
s
echboi Station Master   Joined: Mar 11, 2008
Last Visited: Jun 24, 2008
Location: sitting in a v/locity NOT travelling at 160 kmh


contact

post
Posted: Wed Apr 23, 2008 3:32 pm
exactly, and how long would it take?
 
s
kuldalai Chief Commissioner   Joined: Jan 14, 2003
Last Visited: Nov 20, 2008


contact

post
Posted: Wed Apr 23, 2008 9:36 pm
The track work on the Bendigo - Echuca line is believed to be scheduled over 2 months from mid April to mid June 2008 .
 
s
KEV Train Controller   Joined: Aug 18, 2006
Last Visited: Nov 15, 2008
Location: Melbourne


contact

post
Posted: Thu Apr 24, 2008 3:55 am
wongm wrote:
The stabling yard for Echuca will probably just be a big barbed wirefence around an existing siding.

It's being built from scratch.



WORST JOKE EVER

Q: Why did the Loco blow it's horn?
A: To wake the sleepers.....
 
s
The Vinelander Chief Commissioner   Joined: Mar 28, 2006
Last Visited: Nov 21, 2008
Location: Ballan, Victoria on the Ballarat RFR Line


contact

post
Posted: Thu Apr 24, 2008 6:15 am
per1 wrote:
When will this work begin. And will trains start doing these speeds?


Will you leave that poor girl in peace then Question



The Vinelander, from Melbourne to Mildura was Victoria's only overnight sleeping car train which was launched 8/8/1972.

Ballan, the best town, on the best railway line, in the best state, of the best country in the World.

Longreach, Qld here we come Exclamation The old pioneering town will never be the same. Laughing
 
s
MillzyNo6 Train Controller   Joined: Nov 16, 2004
Last Visited: Nov 20, 2008
Location: Ballarat


contact

post
Posted: Thu Apr 24, 2008 3:44 pm
Will this train be running tomorrow and again on Saturday and what times if it does or not?

Thanks



In two days Tomorrow will be Yesterday....

New YouTube videos up http://www.youtube.com/bukk05 New videos uploaded 29/5/2008!
 
s
Somebody in the WWW Comeng Gunzel   Joined: Oct 08, 2004
Last Visited: Nov 21, 2008


contact

post
Posted: Thu Apr 24, 2008 3:48 pm
How big will the "train stabling facility" at Echuca can be? Hopefully large enough for more than just a single V/Locity set.



"The trains at Pennant Hills run roughly every half hour. Nobody in their right mind uses a service that shoddy. That so many do just proves how many dumb and/or desperate people there are in Sydney." - MrPC
 
s
Duncs Assistant Commissioner   Joined: Apr 19, 2005
Last Visited: Nov 19, 2008


contact

post
Posted: Thu Apr 24, 2008 6:14 pm
kuldalai wrote:
The Bendigo - Echuca line is 94lb jointed as far as Rochester, and much older 80lb jointed rail from Rochester onto Echuca .

The Bendigo - Swan Hill line is 94lb jointed as far as Kerang, and older 80lb jointed rail Kerang - Swan Hill .

The reclaimed 94lb rail re-claimed from the RFR upgrades would be being used to upgrade by relaying the 80lb old rail with reasonably young 94lb rail between Kerang and Swan Hill and between Rochester and Echuca .

After these sort of track upgrade works even with jointed rail and adequate ballast and tie renewal 100 kmh should be achievable for DMU on the Echuca line (currently 75kmh), and 100kmh Kerang - Swan Hill for loco hauled (currently 90 kmh). If the tracks were continuously welded then even higher speeds should be achievable like 115 kmh loco hauled to Swan Hill, and 115 kmh DMU to Echuca .


So based on these speeds, what would be the travel times for Bendigo to Echuca and Bendigo to Swan Hill assuming joined 94lb rail and also what travel time could be achieved for 94lb welded rail?
 
s
per1 Junior Train Controller   Joined: Jul 24, 2006
Last Visited: Nov 17, 2008


contact

post
Posted: Thu Apr 24, 2008 8:59 pm
Will Echuca then get more than one service a day? A Melb morning train should be expected. Everyone get onto the local members. This is the only way to get things done. Annoy them silly.
 
s
kuldalai Chief Commissioner   Joined: Jan 14, 2003
Last Visited: Nov 20, 2008


contact

post
Posted: Thu Apr 24, 2008 9:16 pm
With 100kmh DMU running on the Echuca line in lieu of the existing 75 kmh a reduction in travel time of 15 minutes to around 60 mins for the 80 kms distance should be achievable.

What will determine when Echuca gets a day return train service from Melbourne on Weekdays (i:e: a second or third return trip on Weekdays) is not the condition of the track but rather the availability of rollingstock .

On one hand VLP will have two extra V/locity sets (up from 38 to 40 by years end) BUT some of this extra capacity has been soaked up already by allocating 2 x Sprinters to Stony Point and VLP is potentially faced with probably operating its North East Albury services on sg which will require extra passenger rollingstock above the current fleet.

However when an extra DMU set is available Echuca can be given one or even two extra return trips per Weekday by extending existing Bendigo trips. In reality it would be more efficient to run two extra trips rather than have a train set and crew sit at Echuca from late morning till late afternoon . Viz: 0700 Dn form Midday Up Echuca; 1300 Dn form late afternoon Up Echuca .

Alternatively a single Sprinter could be allocated to Bendigo and that could run two return trips Bendigo/Echuca on Weekdays connecting with Bendigo - Melbourne mainline trains . (Viz: am Dn, Midday Up, Early afternoon Dn, Late afternoon Up.)
 
s
Display from:   

Post new thread Reply to thread Railpage Australia™ Forum Index -> Victoria
Page 1 of 3  [ Previous thread ] :: [ Next thread ] Goto page 1, 2, 3  Next

All times are GMT + 10 Hours




Jump to:  
You cannot post new threads in this forum
You cannot reply to threads in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



Powered by phpBB 2.0.6 © 2001 phpBB Group

Theme images and concept © 2004 by Michael Greenhill and Railpage, All Rights Reserved.
Version 2.0.6 of PHP-Nuke Port by Tom Nitzschner © 2002 www.toms-home.com
Forums ©



Web site powered by PHP-NukeAll logos and trademarks in this site are property of their respective owner
The comments are property of their posters, all the rest is © 2003-2008 Interactive Omnimedia

You can syndicate our news using the news ticker or one of the RSS feeds
Web site engine's code is Copyright © 2003 by PHP-Nuke. All Rights Reserved.
PHP-Nuke is Free Software released under the GNU/GPL license.
Page Generation: 0.071 Seconds -- Current Server Load: 0.35%