Railpage Australia™
  
No Clean Feed - Stop Internet Censorship in Australia
The premier Australian rail server - wasting time and bandwidth since 1992!
 
home
news
discussions
content
site

technical support
Need Help? Lodge a support ticket!

Note: This is for technical support only. General questions about railways should be posted to the Forums.
donation
Donate using PayPal
Please Donate!
photo comp
Have YOU voted yet on Photo of the Month?

Click Here!

Voting Closes 31/12
search


 
faqsearchusergroups profileLog in

Platform extension works at Southern Cross

Post new thread Reply to thread Railpage Australia™ Forum Index -> Victoria
Page 1 of 1   [ Previous thread ] :: [ Next thread ]

Author Message
Turbo Thomas Chief Train Controller   Joined: Jan 21, 2006
Last Visited: Nov 21, 2008
Location: Melbourne,Geelong most weekends


contact

post
Posted: Sat Aug 02, 2008 3:45 pm
I noticed that the are extending platforms 1 & 2 at Southern Cross, does anyone know if there are any particular trains that this is being done for, or is it just a general platform extension.
 
s
fast01 BUTTSCRATCHER!   Joined: Sep 01, 2004
Last Visited: Dec 5, 2008
Location: Reloading


contact

post
Posted: Sat Aug 02, 2008 6:57 pm
Don't quote me on it but I believe it is for the Reintroduction of the Motorail services...  
s
Chris Brownbill Chief Commissioner   Joined: Nov 02, 2003
Last Visited: Dec 4, 2008


contact

post
Posted: Sat Aug 02, 2008 9:15 pm
Turbo Thomas wrote:
I noticed that the are extending platforms 1 & 2 at Southern Cross, does anyone know if there are any particular trains that this is being done for, or is it just a general platform extension.


I think someone posted here a little while ago that it is merely to complete the requirement that the amount of platform facing at Southern Cross station must equal that of the former Spencer Street. So it was always planned to be done, but hadn't been until now for reasons beyond my ken.
 
s
vlocity160 V/Gunzel   Joined: May 03, 2006
Last Visited: Dec 3, 2008


contact

post
Posted: Sat Aug 02, 2008 10:06 pm
fast01 wrote:
the Reintroduction of the Motorail services...


I heard the same thing. I also heard that access would be via the road that leads into and out of the coach terminal out Southern Cross, behind DFO and near plat 1, behind where the portables of no 1 box and other other staff portables are located.



Regards,
Matt
SRHC Member/Volunteer
 
s
kuldalai Chief Commissioner   Joined: Jan 14, 2003
Last Visited: Dec 2, 2008


contact

post
Posted: Sat Aug 02, 2008 10:53 pm
The original spec for the new station requires that the total country platform length of the old station (platforms 1 to Cool which IIRC was 2700m has to be met within the new completed station .

In building the new station the following plats lost length - 1 was halved, and 2 - 7 all lost varying lengths at the Southern end so that they all lined up straight with the concourse. In the process many loco release roads and intermediate crossovers in 2a, 2b, 4a, and 6a roads were relocated also .

To make up for the lost platform length the following additions have been made : 8 South (New platform on alignment of former Parcels Coach Dock), an extension of platform 8 proper at the Northern end. Finally now the sg trackwork is complete at mouth of plats 1 & 2 the final extension of platform 2 in a northward direction by 70m or so is in construction . The existing length of platform 2 is dual gauge, but the extension is on sg only . The platform extension goes as far as the departure signal on the curve. (No extension of platform 1 it is as long as it can be .)
This will give three (3) sg platform faces being 1, 2a (Centre), 2b (North).
Plat 1 is dead end no run arounds . Plat 2 for full length or as two separate platforms can be operated independently with full dual gauge loco run around available. Also trains can arrive/depart on either gauge into 2 a (Centre) platform via 2a road and the dual gauge centre platform crossover , (whilst 2b (North) is occupied by another train on either gauge.)

In future if required dual gauge access could be provided into platform 3a (Centre) by access from 2a to 2b road into 3 South .

The potential Motorail Dock if there ever is a user for it is the sg spur coming off the access track to platform 1 on the Spencer St side just in front of the old No. 1 Box. Currently no point motor or signals and spiked out .

Track diagram is here :

www.signaldiagramsandphotos.com/My_Web_pages/VR/Metropolitan/21'2008.htm
 
s
Display from:   

Post new thread Reply to thread Railpage Australia™ Forum Index -> Victoria
Page 1 of 1  [ Previous thread ] :: [ Next thread ]

All times are GMT + 10 Hours




Jump to:  
You cannot post new threads in this forum
You cannot reply to threads in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



Powered by phpBB 2.0.6 © 2001 phpBB Group

Theme images and concept © 2004 by Michael Greenhill and Railpage, All Rights Reserved.
Version 2.0.6 of PHP-Nuke Port by Tom Nitzschner © 2002 www.toms-home.com
Forums ©



Web site powered by PHP-NukeAll logos and trademarks in this site are property of their respective owner
The comments are property of their posters, all the rest is © 2003-2008 Interactive Omnimedia

You can syndicate our news using the news ticker or one of the RSS feeds
Web site engine's code is Copyright © 2003 by PHP-Nuke. All Rights Reserved.
PHP-Nuke is Free Software released under the GNU/GPL license.
Page Generation: 0.935 Seconds -- Current Server Load: 0.51%