Anybody passing thru Lindfield NSW will notice the station overhead pedestrian walkway and booking office being remodelled.
In addition to the booking office relocation the roof has also been removed from the precast concrete signal box on the Up end of platforms 2/3 and the lever frame lifted out and placed along side the Pacific Hwy entrance. The frame can be readily seen from the pedestrian walkway.
I assume the box is due for demolition shortly as a temporary board fence has been erected around the signal box.
Innuendo is not Italian for suppository
|
|
 |
Junction box
Chief Train Controller
Joined: Nov 18, 2005 Last Visited: Jan 8, 2009 Location: newy
contact
|
post
|
|
| Junction box |
|
 |
Posted: Thu Sep 25, 2008 11:37 am
|
|
It was only a small box, when are locals going to lobby for their heritage preservation, future generations would like to see things like that still place.
|
|
 |
nosecone
Chief Commissioner
Joined: Aug 08, 2004 Last Visited: Jan 8, 2009
contact
|
post
|
|
|
 |
awsgc24
Minister for Railways
Joined: Feb 18, 2003 Last Visited: Jan 10, 2009 Location: Sydney, NSW
contact
|
post
|
|
Posted: Sat Sep 27, 2008 4:00 pm
|
|
The new lift and power room will go more or less where the old signal box was. The signal box was very ugly, the one at Gordon is much nicer.
|
|
 |
TheLoneGunMan
Chief Train Controller
Joined: Nov 13, 2005 Last Visited: Jan 6, 2009 Location: Lineside taking pictures of trains and railway stations
contact
|
post
|
|
| TheLoneGunMan |
|
 |
Posted: Tue Sep 30, 2008 4:29 pm
|
Hi All,
I hope that they invest some money towards linking the terminal road platform 2 to the up and down shore lines at the Hornsby end of the station, like the arrangement at Gordon.
Mike P
|
|
 |
M636C
Chief Commissioner
Joined: Aug 18, 2005 Last Visited: Jan 2, 2009
contact
|
post
|
|
Posted: Tue Sep 30, 2008 4:48 pm
|
Early photos from the single track era show most of the stations, including Lindfield, had an open lever frame under the projecting station roof at the entrance end, where the ticket office was later located at Roseville, Killara and Turramurra (and probably Wahroongah, Waitara and possibly Warrawee, although it had only a single platform originally).
On double tracking, of course these lost any point controls but presumably were kept for signal operation until automatic signals were introduced, I guess with electrification.
Chatswood and Gordon kept these frames and a wooden signal box was built around them. Does anyone know when Lindfield got its separate box?
What is happening to the Lindfield frame? Is it intended to replace it on the station somewhere?
M636C
|
|
 |
awsgc24
Minister for Railways
Joined: Feb 18, 2003 Last Visited: Jan 10, 2009 Location: Sydney, NSW
contact
|
post
|
|
Posted: Sat Nov 01, 2008 12:09 pm
|
The old lever frame has disappeared.
The base for the lift on Platform1 has be dug, and one layer of concrete poured.
The progress of the lift on platform 2/3 is hidden by hoarding.
A start had been made on the piling on the new longer ramp on the highway side.
|
|
 |
awsgc24
Minister for Railways
Joined: Feb 18, 2003 Last Visited: Jan 10, 2009 Location: Sydney, NSW
contact
|
post
|
|
Posted: Thu Nov 06, 2008 1:37 pm
|
FYI, the booking office on the bridge has been replaced by a temporary BO in a custom modified 40 ISO container which is located on the Highway where the Bank used to be.
Progress is being made pouring the concrete base for the P1 lift.
|
|
 |
awsgc24
Minister for Railways
Joined: Feb 18, 2003 Last Visited: Jan 10, 2009 Location: Sydney, NSW
contact
|
post
|
|
Posted: Wed Nov 19, 2008 10:45 am
|
Piles for the west side ramp and station buildings are starting to be poured.
Given talk about quad track from Chatswood to Gordon, it is not clear if these new piles leave room for a fourth track on the west side, including a platform?
|
|
 |
Sydney_Gunzel
Assistant Commissioner
Joined: Jun 03, 2008 Last Visited: Jan 4, 2009 Location: Gunzelling in Tasmania.
contact
|
post
|
|
| Sydney_Gunzel |
|
 |
Posted: Sun Dec 07, 2008 3:57 pm
|
|
Bringing this up, the lever frame from Lindfield has been acquired by SPER [Sydney Tramway Museum] who plan, among other things, to use one or two levers in their restoration of a cable-tram grip. No pics of the relocated one but it looks the same as in Nosecones shots.
|
|
 |
edison
Chief Commissioner
Joined: Feb 19, 2005 Last Visited: Dec 19, 2008
contact
|
post
|
|
Posted: Sun Dec 07, 2008 10:11 pm
|
|
Stretching the topic to two stations further south - Chatswood lever frame is to be installed in the bus interchange outside the new Chatswood station. There is a pit of indeterminate depth, i.e. the temp fence around it makes it impossible to see the bottom of it, and there is a small container inside the fence, presumably containing the frame in question.
|
|
 |
awsgc24
Minister for Railways
Joined: Feb 18, 2003 Last Visited: Jan 10, 2009 Location: Sydney, NSW
contact
|
post
|
|
Posted: Mon Dec 15, 2008 7:48 pm
|
|
The reinforcing for the concrete boxes containing the lift towers now show the doors.
|
|
 |
awsgc24
Minister for Railways
Joined: Feb 18, 2003 Last Visited: Jan 10, 2009 Location: Sydney, NSW
contact
|
post
|
|
Posted: Fri Dec 19, 2008 8:33 pm
|
| awsgc24 wrote: | | The reinforcing for the concrete boxes containing the lift towers now show the doors. |
The concrete for the concourse level lift door has been poured and the formwork extended one more level upwards.
Last edited by awsgc24 on Wed Dec 24, 2008 8:37 pm; edited 1 time in total
|
|
 |
upperquadrant
Station Master
Joined: Oct 23, 2008 Last Visited: Jan 10, 2009 Location: ontop of a white stick
contact
|
post
|
|
|
 |
awsgc24
Minister for Railways
Joined: Feb 18, 2003 Last Visited: Jan 10, 2009 Location: Sydney, NSW
contact
|
post
|
|
Posted: Fri Dec 26, 2008 7:19 pm
|
| Sydney_Gunzel wrote: | | Bringing this up, the lever frame from Lindfield has been acquired by SPER [Sydney Tramway Museum] who plan, among other things, to use one or two levers in their restoration of a cable-tram grip. No pics of the relocated one but it looks the same as in Nosecones shots. |
The pic shows 6 white (or spare) levers in the Lindfield frame, and these could easily be used for SPER purposes without affecting the functionaluity of the rest of the frame.
|
|
 |
|
|