Railpage Australia™
Diamond Valley Railway  
The premier Australian rail server - wasting time and bandwidth since 1992!
 
home
news
discussions
content
site

technical support
Need Help? Lodge a support ticket!

Note: This is for technical support only. General questions about railways should be posted to the Forums.
donation
Donate using PayPal
Please Donate!
photo comp
Have YOU voted yet on Photo of the Month?

Click Here!

Voting Closes 31/12
search


 
faqsearchusergroups profileLog in

Lindfield Box and Station remodelling.

Post new thread Reply to thread Railpage Australia™ Forum Index -> Signalling and Infrastructure
Page 1 of 1   [ Previous thread ] :: [ Next thread ]

Author Message
sandown Deputy Commissioner   Joined: Jan 24, 2004
Last Visited: Dec 1, 2008
Location: sydney


contact

post
Posted: Wed Sep 24, 2008 11:19 pm
Anybody passing thru Lindfield NSW will notice the station overhead pedestrian walkway and booking office being remodelled.

In addition to the booking office relocation the roof has also been removed from the precast concrete signal box on the Up end of platforms 2/3 and the lever frame lifted out and placed along side the Pacific Hwy entrance. The frame can be readily seen from the pedestrian walkway.

I assume the box is due for demolition shortly as a temporary board fence has been erected around the signal box.



Innuendo is not Italian for suppository
 
s
Junction box Chief Train Controller   Joined: Nov 18, 2005
Last Visited: Nov 29, 2008
Location: newy


contact

post
Posted: Thu Sep 25, 2008 11:37 am
It was only a small box, when are locals going to lobby for their heritage preservation, future generations would like to see things like that still place.
 
s
nosecone Chief Commissioner   Joined: Aug 08, 2004
Last Visited: Dec 3, 2008


contact

post
Posted: Sat Sep 27, 2008 3:23 pm
Junction box wrote:
It was only a small box, when are locals going to lobby for their heritage preservation, future generations would like to see things like that still place.

I agree and I think Lindfield Station worked OK without any redesign. I think the big win was at Gordon where as much of the fabric of the old station survived the dual elevator and new pedestrian ramp installations.

Here's some images of Lindfield taken early morning last Saturday, 20-Sep-08. Unless you crawl under the floor of a platform box, or get underneath an elevated box, you don't normally get such an informative look at all those cams and tappets:


Image opens in a new window

Image opens in a new window

Image opens in a new window

Image opens in a new window

Image opens in a new window
 
s
awsgc24 Minister for Railways   Joined: Feb 18, 2003
Last Visited: Dec 2, 2008
Location: Sydney, NSW


contact

post
Posted: Sat Sep 27, 2008 4:00 pm
The new lift and power room will go more or less where the old signal box was. The signal box was very ugly, the one at Gordon is much nicer.
 
s
TheLoneGunMan Chief Train Controller   Joined: Nov 13, 2005
Last Visited: Nov 26, 2008
Location: Lineside taking pictures of trains and railway stations


contact

post
Posted: Tue Sep 30, 2008 4:29 pm
Hi All,

I hope that they invest some money towards linking the terminal road platform 2 to the up and down shore lines at the Hornsby end of the station, like the arrangement at Gordon.

Mike P
 
s
M636C Chief Commissioner   Joined: Aug 18, 2005
Last Visited: Dec 3, 2008


contact

post
Posted: Tue Sep 30, 2008 4:48 pm
Early photos from the single track era show most of the stations, including Lindfield, had an open lever frame under the projecting station roof at the entrance end, where the ticket office was later located at Roseville, Killara and Turramurra (and probably Wahroongah, Waitara and possibly Warrawee, although it had only a single platform originally).

On double tracking, of course these lost any point controls but presumably were kept for signal operation until automatic signals were introduced, I guess with electrification.

Chatswood and Gordon kept these frames and a wooden signal box was built around them. Does anyone know when Lindfield got its separate box?

What is happening to the Lindfield frame? Is it intended to replace it on the station somewhere?

M636C
 
s
awsgc24 Minister for Railways   Joined: Feb 18, 2003
Last Visited: Dec 2, 2008
Location: Sydney, NSW


contact

post
Posted: Sat Nov 01, 2008 12:09 pm
The old lever frame has disappeared.

The base for the lift on Platform1 has be dug, and one layer of concrete poured.

The progress of the lift on platform 2/3 is hidden by hoarding.

A start had been made on the piling on the new longer ramp on the highway side.
 
s
awsgc24 Minister for Railways   Joined: Feb 18, 2003
Last Visited: Dec 2, 2008
Location: Sydney, NSW


contact

post
Posted: Thu Nov 06, 2008 1:37 pm
FYI, the booking office on the bridge has been replaced by a temporary BO in a custom modified 40 ISO container which is located on the Highway where the Bank used to be.

Progress is being made pouring the concrete base for the P1 lift.
 
s
awsgc24 Minister for Railways   Joined: Feb 18, 2003
Last Visited: Dec 2, 2008
Location: Sydney, NSW


contact

post
Posted: Wed Nov 19, 2008 10:45 am
Piles for the west side ramp and station buildings are starting to be poured.

Given talk about quad track from Chatswood to Gordon, it is not clear if these new piles leave room for a fourth track on the west side, including a platform?
 
s
Display from:   

Post new thread Reply to thread Railpage Australia™ Forum Index -> Signalling and Infrastructure
Page 1 of 1  [ Previous thread ] :: [ Next thread ]

All times are GMT + 10 Hours




Jump to:  
You cannot post new threads in this forum
You cannot reply to threads in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



Powered by phpBB 2.0.6 © 2001 phpBB Group

Theme images and concept © 2004 by Michael Greenhill and Railpage, All Rights Reserved.
Version 2.0.6 of PHP-Nuke Port by Tom Nitzschner © 2002 www.toms-home.com
Forums ©



Web site powered by PHP-NukeAll logos and trademarks in this site are property of their respective owner
The comments are property of their posters, all the rest is © 2003-2008 Interactive Omnimedia

You can syndicate our news using the news ticker or one of the RSS feeds
Web site engine's code is Copyright © 2003 by PHP-Nuke. All Rights Reserved.
PHP-Nuke is Free Software released under the GNU/GPL license.
Page Generation: 0.027 Seconds -- Current Server Load: 0.96%