Very disappointing to those who live on the outer edges of Cranbourne on that single track. The suburbs in the South Eastern are growing rapidly and the Clyde electrification project should be planned and prepared right now. Danm even the North East Link which is in the same timeframe on Infrastructure Victoria list gets a go ahead. I thought this government was against using politics to prioritise projects to their own benefit. Cranbourne rail duplication and extension should be the next top priority but apparently it must be done after metro tunnel which is opens in 10 years time.
If you look at the 0-15 year list for Infrastructure Victoria, I reckon I would of ranked North East Link near the bottom. Train timetabling for the Werribee line which has stalled, Melton electrification, Clyde extension of course, and even 10 car trains/high capacity signalling is even better.
If you wanna sign petition website is here:https://www.cranbournerail.com.au