Gheringhap Sightings w/e 18/11/2017.
 
There were 78 sightings for this week; this is 2 sightings less than last week, making a total of 4483 sightings for this year to date. On day 322 last year we had seen 3461 sightings, this is 1022 sightings more than at the same time last year.

We saw 6 sightings on the Broad Gauge, which is 4 sightings less than last week. This total included 2 PN Grain trains and 0 Qube Grain trains. Total B/G trains for this year are 865 (At the same time last year we had seen 462 B/G trains, this is 403 more than last year.) Total B/G grain trains for this year are 681 (At the same time last year we had seen 234 grain trains on the B/G).  

We saw 72 sightings on the Standard Gauge which is 2 sightings more than last week. This total included 3 PN Grain trains and 0 SSR Grain trains. Total S/G trains for this year are 3618. (At the same time last year, we had seen 2999  S/G trains, this is 619 more than last year.) Total S/G grain trains for this year are 640. (At the same time last year, we had seen 109 grain trains on the S/G).

Total grain trains for this year are 1321, this is 978 more than at the same time last year.


Regards, Graham Elliott.
 
Gheringhap Loop is at the 82/83 Kp post South West of Melbourne Australia.
 
Please visit Gheringhap Loop Sightings.

Website.                                              [color=#0563c1][size=3][font=Calibri]http://ghaploop.railpage.org.au/[/font][/size][/color]

Sponsored advertisement

  cbinyon Locomotive Driver

Thanks Graham.

Interesting to note how quiet the grain traffic especially on BG has died down the past two weeks. Id expect it to be firing in the next few weeks.
  Trainplanner Chief Commissioner

Location: Along the Line
If there is still such a thing as the "normal" cycle for grain, there is always a lull between the clear out of last year's harvest and the preparation for the new harvest.  Tradiuonally a lot of maintenance upgrades and fumigation etc is undertaken.  In addition there has been some wet weather in Westrn and northern Victoria that will have disrupted things.
  BrentonGolding Chief Commissioner

Location: Maldon Junction
Plus lots of activity in Portland last week which obviously doesn't travel via G Loop.

BG

Sponsored advertisement

Display from: