Castlemaine to Maryborough line dismantling

 
  Driver667 Locomotive Driver

Location: North of Melb where the snow falls occasionally
I hear on the grape vine that the line from Castlemaine to Maryborough is to be lifted starting Monday (14-4-14). If this is true, it looks like they want to make sure no one can put up the proposal for a pass across there again.

Sponsored advertisement

  Valvegear Dr Beeching

Location: Norda Fittazroy
Is VicTrack ( or whatever it's called this week ) in a competition to see which organisation is the most shortsighted?  They'd be well ahead already, one would think, after singling a good deal of the Bendigo line.
  bevans Site Admin

Location: Melbourne, Australia
I hear on the grape vine that the line from Castlemaine to Maryborough is to be lifted starting Monday (14-4-14). If this is true, it looks like they want to make sure no one can put up the proposal for a pass across there again.
Driver667


My information (not sure 100% correct) is the level crossings ONLY are to be done.

Regards
Brian
  xxxxlbear Token Booking Clerk

Location: Geelong
My information (not sure 100% correct) is the level crossings ONLY are to be done.

Regards
Brian
bevans

According to the Rail Revival Alliances facebook page, a post by a Duncan Ramsey says that the crossings are going to be ripped up starting Monday (I presume he means next Monday 14/04/14 as the post was made 17 hours ago).

Reference: Rail Revival Alliance, Facebook
  ZH836301 Chief Commissioner

Location: BleakCity
How is resurfacing crossings a crime?

Even if they removed the whole line, the current infrastructure would need to be replaced for a passenger service anyway.
  Bogong Chief Commissioner

Location: Essendon Aerodrome circa 1980
Exactly. Removing rails from level crossings is a great idea. People won't have to negotiate an unnecessary speed bump over a line that hasn't been used for a decade.

IF "they" ever decide they want to use the line again, is any of the track even usable today? Or would they have to replace it all anyway?
  The Vinelander Minister for Railways

Location: Ballan, Victoria on the Ballarat RFR Line
How is resurfacing crossings a crime?

Even if they removed the whole line, the current infrastructure would need to be replaced for a passenger service anyway.
ZH836301

As much as I'm loathe to agree with ZH, it's a relevant point that the track needs to be replaced in its entirety in the event I live long enough to see the...I'm going to call it the 'Western Crescent' line reinstated for pax services.

Mike.
  JimYarin Chief Commissioner

Location: Adelaide, South Australia
As much as I'm loathe to agree with ZH, it's a relevant point that the track needs to be replaced in its entirety in the event I live long enough to see the...I'm going to call it the 'Western Crescent' line reinstated for pax services.

Mike.
The Vinelander


so is the line being taken up or just the crossings?
  beanzs27 Assistant Commissioner

Only level crossings according to Bendigo Advertiser
http://www.bendigoadvertiser.com.au/story/2213584/unused-railway-to-be-removed/
  stuie83 Train Controller

Location: Stawell
track and all the signs have gone from Moscript St crossing and working on Stephen St today
  lkernan Deputy Commissioner

Location: Melbourne
I took a detour coming back from the Bendigo model railway show this afternoon to check out this work. So far 2 crossings have been done.

One thing i can't figure out is how they got nine crossings? Even with private crossing, the only way to get nine in Castlemaine would be to count the ones used by VGR (which are still there)

http://www.flickr.com/photos/37285057@N02/13923045336/

http://www.flickr.com/photos/37285057@N02/13946577374/

Still to be done:

http://www.flickr.com/photos/37285057@N02/13923047301/

This one shows the track condition a little better!

http://www.flickr.com/photos/37285057@N02/13946282285/
  RustyRick Chief Commissioner

Location: South West Vic
"One thing i can't figure out is how they got nine crossings? Even with private crossing, the only way to get nine in Castlemaine would be to count the ones used by VGR (which are still there)"

The news talked about Castlemaine area - probably includes those out through Campbells Creek and towards Guildford.

Rick
  Nightfire Minister for Railways

Location: Gippsland
"One thing i can't figure out is how they got nine crossings? Even with private crossing, the only way to get nine in Castlemaine would be to count the ones used by VGR (which are still there)"

The news talked about Castlemaine area - probably includes those out through Campbells Creek and towards Guildford.

Rick
RustyRick

And out Newstead way
  Highrailer Assistant Commissioner

Location: Somewhere out on the track......anywhere around the country
I see the regional growth fund for the Mt Alexander shire includes $822.000 towards a walking and cycling track from Castlemaine to Newstead.
So I wonder.........Are they going to pull the line up to build this track ?
  Catdog Station Staff

Location: Koyuga, Victoria, Australia
Now that the rail crossings have been removed, would they need to be grade separated if the line were to be reopened?
  railblogger Chief Commissioner

Location: At the back of the train, quitely doing exactly what you'd expect.
Now that the rail crossings have been removed, would they need to be grade separated if the line were to be reopened?
Catdog

Probably not. The amount of traffic would not warrant it.
  Gman_86 Chief Commissioner

Location: Melton, where the sparks dare not roam!
No, the policy is no NEW crossings, this would not be a new crossing, merely a reopened crossing.
  Nightfire Minister for Railways

Location: Gippsland
Now that the rail crossings have been removed, would they need to be grade separated if the line were to be reopened?
Catdog

I would say that's the Government bureaucrats evil plan to bury the line future In an Icy tomb.

As I have said there are 100's of former level crossings around the State that still have rails Imbedded In the road pavement, they only get removed If there Is a pressing maintenance Issue with the road surface around the abandon rails and when the road gets reconstructed, realigned or widened.
  The Vinelander Minister for Railways

Location: Ballan, Victoria on the Ballarat RFR Line
I noticed on a recent Sunday drive along the Midland Hwy between Showell's Hill, near Campbells Creek and Yandoit/Guildford that the line has recently been completely lifted and sleepers removed. Perhaps the rail trail is finally on its way.

Mike.
  lkernan Deputy Commissioner

Location: Melbourne
I noticed on a recent Sunday drive along the Midland Hwy between Showell's Hill, near Campbells Creek and Yandoit/Guildford that the line has recently been completely lifted and sleepers removed. Perhaps the rail trail is finally on its way.

Mike.
The Vinelander
The VGR has been reclaiming track for their line.  
They've been documenting it on their blog: https://vgrcivil.blog/