Design fault of MSTS, if overhead wire is added then it will be added to the whole route, not just a small section. there is away to get rid of it on small sidings but not for a mainline.
Bob
BrianBChief Train ControllerJoined: Dec 28, 2004 Last Visited: Nov 22, 2008 Location: Brisbane
The overhead wiring IS actually in CTN - its just that it is 1000m in the air!!!
If you know what you're doing, you can edit the .trk file, and reset the wire height to the normal 5.3 metres for the NSW gantries, then check the 'overhead wires' checkbox in the MSTS settings to make it visible.
Regards, Brian
AC16Assistant CommissionerJoined: Aug 30, 2004 Last Visited: Nov 7, 2008
You cannot post new threads in this forum You cannot reply to threads in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum