fabricator wrote:
The stations usually have big portal structures which cross over the platform(s) and both tracks. Have a look at the new Munno Para station for an example (although being new they di ...

Read more »


Posted Thu May 23, 2013 9:38 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

don_dunstan wrote:
Has there been a big cut-back of those huge pine trees in Edwardstown?  There's heaps of dead pine cones in them and they (did?) look like they'd explode into flames given the chanc ...

Read more »


Posted Wed May 22, 2013 9:03 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

Hi All

Finally got a decent day off to have a good look at the works along the Noarlunga Line today. Things have moved along very quickly since i last had a look. The track is all laid and ballasted  ...

Read more »


Posted Tue Apr 23, 2013 11:24 pm in South Australia by 85trainfan

Replies: 462 | Views: 61130

Somebody wrote:
Does anyone know if the network is supposed to be getting a new signalling system as a result of the electrification work? I'm pretty sure that I read somewhere that there had been $50 million ...

Read more »


Posted Wed Apr 17, 2013 7:07 pm in South Australia by 85trainfan

Replies: 462 | Views: 61130

Today saw the First Testing of actual Railcars on the Seaford Extension. 2 Runs were made today, with the last run returning on the Down track straight back to the Stanvac Stabling yards.

Some Phot ...

Read more »


Posted Fri Apr 12, 2013 9:22 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

Some Photos from Thursday, Only got a few before the Battery went dead. (Must learn to charge the Battery the night before ) Embarassed
Installing the Overhead supports @ Noarlunga Centre. (this was th ...

Read more »


Posted Thu Apr 11, 2013 2:20 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

The purpose of the Crane at Noarlunga Centre today, was for the instalation of the beams over the track. The 2 supports between the platforms and the David Witton Dve bridge were installed.

Read more »


Posted Wed Mar 20, 2013 9:15 pm in South Australia by 85trainfan

Replies: 462 | Views: 61130

2001 wrote:

don_dunstan wrote:

kipioneer wrote:

I noticed on Monday a couple of sleepers across the line at Marino Rocks just before the level crossing  ...

Read more »


Posted Thu Mar 07, 2013 8:26 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

Thanks Ian. didn't realize i had it wrong Embarassed

Read more »


Posted Thu Mar 07, 2013 7:40 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

don_dunstan wrote:

Thanks a lot for these pictures 85trainfan, I wasn't aware until I saw your earlier shots that Edwardstown was being demolished and rebuilt although it does make se ...

Read more »


Posted Thu Mar 07, 2013 4:23 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

Some Photos from Today's Works
Ripping up the Base layer near Raglan Ave [url=http://www.flickr.com/photos/25896045@N02/8535175465/][img:c33140bf68]http://farm9.staticflickr.com/8509/8535175465_6c0a3 ...

Read more »


Posted Thu Mar 07, 2013 4:14 pm in South Australia by 85trainfan

Replies: 82 | Views: 8957

Some photos of the Demolishing of Keswick Station and Surrounding works. The Stairs to access Keswick from the Footbridge have been pulled out and the hand rails reinstated across the gap. Maybe the F ...

Read more »


Posted Fri Feb 08, 2013 4:44 pm in South Australia by 85trainfan

Replies: 173 | Views: 12907

62440 wrote:

No, I understand the first railcar arrives in late May. The live testing is looking at fault currents, earth issues and current delivery including testing all insulators,  ...

Read more »


Posted Thu Feb 07, 2013 8:52 pm in South Australia by 85trainfan

Replies: 82 | Views: 8957

steam4ian wrote:

Major civil works at Wayville site, visble from Anzac Highway bridge.The eastern cutting is being extended towards Cooke Tce.
This could be the start of something big! ...

Read more »


Posted Thu Jan 24, 2013 8:32 pm in South Australia by 85trainfan

Replies: 614 | Views: 71218

OK, Time to bring this thread out of  Retirement for anther round :)Its time for the Final Stage of the Noarlunga Rail Line Upgrade and as of Yesterday (23rd Jan 2013) The Rail was pulled up as far as ...

Read more »


Posted Tue Jan 15, 2013 9:48 am in South Australia by 85trainfan

Replies: 369 | Views: 32052

steam4ian wrote:
BELAIR LINE CONVERTED TO Standard Gauge.
Just to stir things I up.
At a SASMEE working bee this morning I watched workers doing what initially looked like track demolit ...

Read more »


Posted Tue Jan 15, 2013 9:42 am in South Australia by 85trainfan

Replies: 65 | Views: 8357

Some Photos from works today. (Taken after works had finished for the day Razz
The Brownhill Creek Diversion Channel. 13 Segments already in Place.

Read more »


Posted Mon Jan 07, 2013 10:19 pm in South Australia by 85trainfan

Replies: 369 | Views: 32052

Reason for government notices is probable the result of differing site "ownerships".The track rebuild Oaklands to City will be under one contractor and the Underpass will be under another contractor.  ...

Read more »


Posted Mon Jan 07, 2013 8:44 pm in South Australia by 85trainfan

Replies: 369 | Views: 32052

Well of course, they are government projects paid for with our money, not private projects or public-private partnerships. That a number of different contractors are involved in the execution of the w ...

Read more »


Posted Mon Jan 07, 2013 2:25 pm in South Australia by 85trainfan

Replies: 369 | Views: 32052

First noticed them about three weeks ago, numbers 24-22 are on the eastern side between Leader St and Rose Tce by the backside of the showgrounds. It would appear that the numbering is one continuous  ...

Read more »


Posted Thu Dec 20, 2012 8:55 pm in South Australia by 85trainfan

Replies: 4 | Views: 543

- Loxton loop. This initiative provides $415 000, of which $263 000 will be expensed in 2012–13 and $152 000 capitalised in 2013–14, for construction at Loxton that enables improve ...

Read more »


Posted Tue Dec 04, 2012 11:04 am in South Australia by 85trainfan

Replies: 462 | Views: 61130

Update on works as of 4th december 2012

The Ballast Train is now operating on the Up track between the Onkaparinga River Bridge and Noarlunga Centre. Ballast is laid up to the Goldsmith Drive Bridge. ...

Read more »


Posted Thu Nov 22, 2012 2:09 pm in South Australia by 85trainfan

Replies: 34 | Views: 2846

G'day from USAIf Mr Parnell wants a flag to fly try the Noarlonga Centre line.Here we have a depot, Lonsdale, and an intermediate turn back before the track wprk starts.Rail services between NC and Oa ...

Read more »


Posted Thu Nov 22, 2012 1:38 pm in South Australia by 85trainfan

Replies: 15 | Views: 2236

Last weekend Daws Road crossing was closed while they were upgrading the crossing, the silly thing is, that they put bitumen back down instead of concrete.All the crossings that have been upgraded in  ...

Read more »


Posted Tue Nov 20, 2012 11:06 am in South Australia by 85trainfan

Replies: 369 | Views: 32052

The Ugly:

The Noarlunga timetable - 39 eye-watering pages of confusing timetables that make the regular ones look simple. I pity the call centre operators who'll probably be finding them just as hard ...

Read more »


Page 1 of 12

1 of 12 2 3 ... 10 11 12 Next »

Jump to:  

Did you know you can now record your sightings in our new Sightings module?