Australind Minister for Railways

Location: Perth, Western Australia

Yep, DDP just trying to increase his post count!  Laughing

 
zb2125 Locomotive Fireman

Location: ZB2125 And ZB2129 Rocks Than ZB2120

Yep, DDP just trying to increase his post count!  Laughing

- Australind



No

 
NR29 Chief Commissioner

Location: Perth Australia

Yes you are blood post whore....By the way Spotted ZB2125&ZBxxxx 2locos going passed midland traino yesterday 9/01/07 about 5.55pm

 
denshaotoko Chief Train Controller

Location: Perth, Australia

I'll try to get up to Mandurah this weekend

- denshaotoko

I think you mean down to Mandurah if you live in Perth  Laughing

- Australind

Nope, from Pinjarra it's UP.  Cool

Unfortunately, real life cropped up, and the missus dragged me out on Peel Inlet for the day.

I'll try for this weekend, at least with the current weather forecast lighting conditions should be perfect for taking photos.

 
denshaotoko Chief Train Controller

Location: Perth, Australia

Also noticed a LOT of activity at the northern city tunnel end. Track appears to have been fixed down from ground level to tunnel entrance.

Near the "toy" car sales agent, an area has been set aside where short pieces of track appear to have been pre-assembled with sleepers. I assume that these are planned to be used for rapid placement when the connection is made between the tracks coming out of the tunnel and the current track on the Clarkson Line.

 
Auxodium Chief Commissioner

Location: Kickin it in da Gwood aiiiii

hey i missed the nova morning segment about the tunnel walk. Any details on it guys?

 
koolbardi Junior Train Controller
 
Mike_in_the_west Chief Commissioner

Location: Perth, WA

I just entered.   shoe size?  They are going to be in for a shock when I put 17 down!  That is no lie...

 
nachoman Assistant Commissioner

The big Speno machine is currently just north of the Narrows.

 
Tyler Chief Commissioner

Location: Perth

Last night it was on 3 or 4 low loaders waiting on the Riverside on-ramp until the southbound freeway was briefly closed so they could be lifted onto the tracks by two cranes in the bus lane.

It's a massive machine.

While looking at the last Track and Signal magazine for 2005 which has the Speno machine pasted all over it's front cover, there is also 2 small pictures of Allanah McTiernan with the machines and a manager. Didn't realise till now.  Smile

 
skitz Chief Commissioner

Last night it was on 3 or 4 low loaders waiting on the Riverside on-ramp until the southbound freeway was briefly closed so they could be lifted onto the tracks by two cranes in the bus lane.

It's a massive machine.

While looking at the last Track and Signal magazine for 2005 which has the Speno machine pasted all over it's front cover, there is also 2 small pictures of Allanah McTiernan with the machines and a manager. Didn't realise till now.  Smile

- Tyler

Massive?  Its their smallest grinder at only 16 stones.  Apparently able to take another module to make it 24 stones.

Seems like a hell of a long way to mobe a machine (as said in the Australian, from Sydney) for a small job.  I guess the political mileage is paying for or justifying the cost of the job.

 
NR29 Chief Commissioner

Location: Perth Australia

All the Mandurah line observation photo :
http://www.warailwaypolice.fotopic.net/c1162243.html

Southern suburb railway (Mandurah line)and other photo will be update next week.. feel free to browse the website

 
nachoman Assistant Commissioner

The PTA repeater tower at the Narrows was erected in the last day or so (freqs)

 
trisreed Locomotive Fireman

Location: Perth, WA

Any photos?

 
S550 Station Master

Location: Perth WA

Any photos?

- trisreed

Can't help with the antenna yet but you can see the grinder at the Narrows here;

http://www.geoproject.com.au/dsc_1965jpeg.jpg

S550

 
denshaotoko Chief Train Controller

Location: Perth, Australia

The SSR (southbound track) is about two metres away from being connected up to the Fremantle Line. The switches are installed on the Fremantle Line (westbound) and sleepers are already laid down in the intervening 2m gap, but there is still about 2m of actual track missing on top of the sleepers.

Anyone know when the historic missing piece will be fitted?

 
NMR watcher Assistant Commissioner

The SSR (southbound track) is about two metres away from being connected up to the Fremantle Line. The switches are installed on the Fremantle Line (westbound) and sleepers are already laid down in the intervening 2m gap, but there is still about 2m of actual track missing on top of the sleepers.

Anyone know when the historic missing piece will be fitted?

- denshaotoko

You better consult Alannah McTiernan's  or Alan Carpenter's Appointment Books.

 
iceman Deputy Commissioner

Location: Back home in Frankston.

All the Mandurah line observation photo :
http://www.warailwaypolice.fotopic.net/c1162243.html

Southern suburb railway (Mandurah line)and other photo will be update next week.. feel free to browse the website

- Transit Guard

I noticed RG8 in one of your pics. So thats where that is. Last time i saw that it was working in Melbourne in the RFR project, I have got some awsome video of it grinding rails at night.

It must be tri gauge? Broad,Std,Narrow.

 
skitz Chief Commissioner

All the Mandurah line observation photo :
http://www.warailwaypolice.fotopic.net/c1162243.html

Southern suburb railway (Mandurah line)and other photo will be update next week.. feel free to browse the website

- Transit Guard

I noticed RG8 in one of your pics. So thats where that is. Last time i saw that it was working in Melbourne in the RFR project, I have got some awsome video of it grinding rails at night.

It must be tri gauge? Broad,Std,Narrow.

- iceman

Certainly is.  An ugly duckling but has been a very busy duckling in the past three years or so.

Last I saw it was doing turnout grinding for Railcorp

 
Auxodium Chief Commissioner

Location: Kickin it in da Gwood aiiiii

damn i missed the tunnel tour competition..... noooo

 
nachoman Assistant Commissioner

the canning bridge repeater tower has also gone up very recently (freqs)

 
Auxodium Chief Commissioner

Location: Kickin it in da Gwood aiiiii

the station (Canning Bridge) was tagged up i noticed as i drove past to go to uni  Mad

 
Australind Minister for Railways

Location: Perth, Western Australia

All the station repeaters have gone up, signals are starting to appear everywhere which is a good sign, work is still being carried out on the Murdoch station.

 
SM Station Master

i've noticed that there is a crossover just cockburn central..

will trains run over directly into the northbound platform either/instead of reversing via the sidings?

if not, whats the point of having them?

 
koolbardi Junior Train Controller

Location: Joondalup

i've noticed that there is a crossover just cockburn central..

will trains run over directly into the northbound platform either/instead of reversing via the sidings?

if not, whats the point of having them?

- SM

It would be up to Train Control on when and how points are used, saying that it's pointless means that you may have not figured out why there would be points at both ends of the station.

It's handy to have points on both ends of the station because if the points on the siding failed then you can crossover over before entering the station and vice versa.

 