Railpage Australia™
  
The premier Australian rail server - wasting time and bandwidth since 1992!
 
home
news
discussions
content
site

technical support
Need Help? Lodge a support ticket!

Note: This is for technical support only. General questions about railways should be posted to the Forums.
donation
Donate using PayPal
Please Donate!
photo comp
Have YOU voted yet on Photo of the Month?

Click Here!

Voting Closes 30/11
search


 
faqsearchusergroups profileLog in

Northern Illawarra V2.0 - Sydney to Wollongong

Post new thread This thread is locked: you cannot edit posts or make replies. Railpage Australia™ Forum Index -> MSTS Routes
Page 1 of 8   [ Previous thread ] :: [ Next thread ] Goto page 1, 2, 3, 4, 5, 6, 7, 8  Next

Author Message
BrianB Chief Train Controller   Joined: Dec 28, 2004
Last Visited: Nov 21, 2008
Location: Brisbane


contact

post
Posted: Thu Jun 21, 2007 2:38 pm
It can now be revealed that the next version of Northern Illawarra, V2.0 will extend the route North from Waterfall right into Sydney Central (and Darling Harbour).

Originally, I had only intended it to go to Sutherland (the edge of the Sydney Metro Area), but the attraction of the 'gauntlet track' over Como Bridge got to me, then I thought why not take it 'up the hill' to Hurstville (where the quad-track starts), but it kept eating away at me, so I thought I'd go to Meeks Road Junctions, where the Metropolitan Goods Lines diverge from the Main Illawarra lines, then I thought its only a few extra miles to go to Erskineville to meet up, where Peter Newell's 'Coals to Newcastle' route ends.

Then I tried an experiment - and it worked!!!!.

With Peter's generous permission, I have been able to merge the last four Sydney end tiles from CTN onto the top of NI - so, we now have the full route from the buffer stops at Sydney Central (and from Darling Harbour) right down to Wollongong. As the main intent of this Sydney end extension was the correct operation of trains along the Main Illawarra Lines, I have selectively 'pruned' some of the non-essential signals and other interactives from the 'borrowed' CTN tiles to help reduce the load on MSTS in these heavily populated tiles.

I'm also including the first stations (but only the first stations) on the Bankstown line out of Sydenham (Marrickville), the East Hills line out of Tempe (Turrella), the Cronulla line out of Sutherland (Kirrawee), but the Royal National Park line will go all the way to the terminus near Audley (remember this timeframe was before the Tramway Museum took over that section of line). These extensions are mainly to allow AI 'red rattler' suburban electric traffic in the background for 'Driver' activities over the Illawarra Main.

But don't get too excited - I'm not intending the route to grow into a de-facto full Sydney Metropolitan Electric Route!!!!



I'm aiming for around the end of September / early October for release. Trackwork is laid, but there is still a LOT of work to do yet!!!

So far, only two minor problems with V1.0 have been advised to me, and they have been corrected, and will be issued as part of the new V2.0

Secondly, I have now accepted an offer from another well-respected Australian route author to do thorough Beta testing, not only over the new V2.0 work, but also retrospectively over the original V1.0 work. This can only help to enhance the quality and accuracy of the Northern Illawarra route. All due thanks to Allan Lowndesborough (author of the excellent 'Adelaide and Hills' route) for his valuable input.

Further information and screenshots will be provided, as and when they come to hand!!!

Regards, Brian Bere-Streeter
 
s
taggy Assistant Commissioner   Joined: Feb 06, 2006
Last Visited: Nov 21, 2008
Location: Wollongong NSW


contact

post
Posted: Thu Jun 21, 2007 4:09 pm
BrianB mate, you are a champ. I will be able to run the Illawarra Express all the way from Central! Best of luck in you route building. Oh, btw, I am enjoying V1 heaps! Laughing Laughing



Aaron

3801, pure beauty.
People are like slinkies, they have no purpose but bring a smile to your face when you push them down the stairs.

http://photobucket.com/nswgr38pics
Member of NSWRTM.
Bruce: "And thats the way the cookie crumbles"
 
s
trolleybusracer Deputy Commissioner   Joined: Dec 12, 2006
Last Visited: Nov 21, 2008
Location: St Albans Sydenham Watergardens Line


contact

post
Posted: Thu Jun 28, 2007 4:40 pm
V 1 rocks i love it
 
s
nazarail Chief Commissioner   Joined: Feb 08, 2003
Last Visited: Nov 22, 2008
Location: meeks road deport


contact

post
Posted: Thu Jun 28, 2007 10:12 pm
sounds awsome look farward to seeing some pics of it, also will be good to compaire it to the same line im building in trainz.



the right place at the right time
http://nathanlyons.fotopic.net/ updated! 29/3 NOW WITH EMUs
 
s
BL35 Station Master   Joined: Oct 17, 2005
Last Visited: Apr 18, 2008
Location: RIGHT HERE


contact

post
Posted: Sun Oct 28, 2007 12:34 pm
are you going to put the xpt maintenence centre in?



'On my train layout, I can just lift trains from one track to another (Five Finger Shunting).
Why Can't The Railways?
 
s
Cs4 Chief Train Controller   Joined: Apr 08, 2004
Last Visited: Nov 19, 2008
Location: Central West NSW


contact

post
Posted: Sun Oct 28, 2007 1:35 pm
I think you'll find that Brian is modelling the era beofre the XPT maintenence centre was built.



Cheers

William
 
s
Fred3801 Chief Commissioner   Joined: Aug 25, 2005
Last Visited: Nov 20, 2008
Location: Inner West, Sydney


contact

post
Posted: Sun Oct 28, 2007 4:47 pm
BL35 wrote:
are you going to put the xpt maintenence centre in?


Dude.

1960s

Rolling Eyes



~ Fred3801 ~

My New Blog – The Young Buff

 
s
GeoffreyHansen Minister for Railways   Joined: Apr 13, 2004
Last Visited: Nov 21, 2008
Location: Waiting for the next commuter service to Bathurst


contact

post
Posted: Mon Oct 29, 2007 12:04 am
What was at Meeks Road before the XPT maintenance centre?
 
s
BrianB Chief Train Controller   Joined: Dec 28, 2004
Last Visited: Nov 21, 2008
Location: Brisbane


contact

post
Posted: Mon Nov 05, 2007 3:43 pm
Meeks Road Junctions – within this triangular space were a small number of local sorting and storage sidings for both Up and Down traffic, along with a siding for the Electricity Substation, one for the Pumping Station and one for the Permanent Way Department.
 
s
PhilChorusch Chief Train Controller   Joined: Dec 09, 2007
Last Visited: Nov 19, 2008
Location: Goulburn NSW


contact

post
Posted: Sat Dec 15, 2007 12:39 am
Hi Brian,

I was wondering would it be possiable if I could have a copy
of either this route or the prevous version please
you don't have to if you don't want to
mate it's becasue I have tryed looking for
it but cannot find it

Thanks for reading my post mate cheers
 
s
ARG706 Chief Commissioner   Joined: Jun 03, 2005
Last Visited: Nov 21, 2008
Location: City of doomsayers


contact

post
Posted: Sat Dec 15, 2007 12:45 am
It's not released.

Cautiousness is very wise when distributing an unfinished product
 
s
Chris Anderson Chief Commissioner   Joined: Nov 12, 2003
Last Visited: Nov 22, 2008
Location: Arriving Somewhere, but Not Here


contact

post
Posted: Sat Dec 15, 2007 12:48 am
But... but... but.... GIMME!!!!



Mr. Anderson... surprised to see me?
 
s
Henry Deputy Commissioner   Joined: Apr 23, 2004
Last Visited: Nov 22, 2008
Location: Farewelling the Last Broad Gauge Train to Albury.


contact

post
Posted: Sat Dec 15, 2007 6:45 am
PhilChorusch wrote:
Hi Brian,

I was wondering would it be possiable if I could have a copy
of either this route or the prevous version please
you don't have to if you don't want to
mate it's becasue I have tryed looking for
it but cannot find it

Thanks for reading my post mate cheers




http://steam4me.railpage.org.au/trainsim/routes/illawarra.html
 
s
Chris Anderson Chief Commissioner   Joined: Nov 12, 2003
Last Visited: Nov 22, 2008
Location: Arriving Somewhere, but Not Here


contact

post
Posted: Sat Dec 15, 2007 6:58 am
Wrong Illawarra route Henry... nice try though.

Brian's route is out there on "the net", but it is version 1. Version 2 will come out when it is finished.



Mr. Anderson... surprised to see me?
 
s
steam4me Deputy Commissioner   Joined: Mar 07, 2003
Last Visited: Nov 9, 2008
Location: Port Melbourne, Victoria


contact

post
Posted: Sat Dec 15, 2007 7:39 am
version 2 is finished......... it's currently with th packagers.

PHIL, SHUT UP................ DON'T SAY A WORD.... NOT A WORD ...................  
s
Display from:   

Post new thread This thread is locked: you cannot edit posts or make replies. Railpage Australia™ Forum Index -> MSTS Routes
Page 1 of 8  [ Previous thread ] :: [ Next thread ] Goto page 1, 2, 3, 4, 5, 6, 7, 8  Next

All times are GMT + 10 Hours




Jump to:  
You cannot post new threads in this forum
You cannot reply to threads in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



Powered by phpBB 2.0.6 © 2001 phpBB Group

Theme images and concept © 2004 by Michael Greenhill and Railpage, All Rights Reserved.
Version 2.0.6 of PHP-Nuke Port by Tom Nitzschner © 2002 www.toms-home.com
Forums ©



Web site powered by PHP-NukeAll logos and trademarks in this site are property of their respective owner
The comments are property of their posters, all the rest is © 2003-2008 Interactive Omnimedia

You can syndicate our news using the news ticker or one of the RSS feeds
Web site engine's code is Copyright © 2003 by PHP-Nuke. All Rights Reserved.
PHP-Nuke is Free Software released under the GNU/GPL license.
Page Generation: 0.978 Seconds -- Current Server Load: 0.16%