Railpage Australia™
  
The premier Australian rail server - wasting time and bandwidth since 1992!
 
home
news
discussions
content
site

technical support
Need Help? Lodge a support ticket!

Note: This is for technical support only. General questions about railways should be posted to the Forums.
donation
Donate using PayPal
Please Donate!
photo comp
Have YOU voted yet on Photo of the Month?

Click Here!

Voting Closes 31/12
search


 
faqsearchusergroups profileLog in

12 seats on each Overland for V/Line ticketed passengers

Post new thread Reply to thread Railpage Australia™ Forum Index -> Victoria
Page 3 of 3   [ Previous thread ] :: [ Next thread ] Goto page Previous  1, 2, 3

Author Message
witsend Chief Commissioner   Joined: Jan 01, 2004
Last Visited: Nov 29, 2008
Location: The Beautiful Copper Coast, and sometimes, just north of Pt. Pirie


contact

post
Posted: Sun Aug 31, 2008 11:39 am
ParkesHub wrote:
I think ARTC will take the fees when and where they can get them, luznug, like all commercial or quasi-commercial organisations. I'd expect the rates for a V'locity to be well over a superfreighter and with little wear and tear to show for the revenue received.


Two things there, ParkesHub.

1) As the line is only rated for 115km/h, the V'locity would only be charged the same rate as the Current Overland, but with a lower variable GTK charge. Your V/Line driver would also need to be route qualified with the ARTC Rules, and appropriate radios for communicating with ARTC Mile End, as well as other Safeworking requirements as defined by ARTC. (Actually, given the current tonnages, it'd attract the minimum 1000T GTK charges, I guess. This would make one very special V'Locity, and a very special driver or two.

2) This V'locity would not be able to take advantage of any of the RFR corridors, and thus perceived improvements wouldn't be their like the train between Ararat and Melbourne, ie Ride Quality/Time etc. It is about 40 minutes faster to travel Melbourne to Ararat on the BG, then on the SG (assuming the Overland was on time). This problem isn't insurmountable because you could look at the Spanish/French Solution of Variable Gauge Axles, all it needs then is an adjuster spur-line from the ARTC Main Line to the Ararat V/Line Line in Ararat.



Regards,

Samuel Wittwer
Member - LC of Yorke Peninusula Rail
 
s
ZH836301 Chief Commissioner   Joined: Apr 26, 2006
Last Visited: Dec 1, 2008
Location: BleakCity


contact

post
Posted: Sun Aug 31, 2008 12:35 pm
Variable Guage Axles to serve some two-bit towns in whoop-whoop land?

Now I've seen it all.
 
s
kuldalai Chief Commissioner   Joined: Jan 14, 2003
Last Visited: Nov 30, 2008


contact

post
Posted: Sun Aug 31, 2008 2:56 pm
If and when any sg VLP service is provided on the Western line to points beyond Ararat it would almost certainly be a shuttle DRC service by sg Sprinter or Vlocity because run as a shuttle service with cross platform connection at Ararat with bg services to/from Melbourne :
* Faster than running via North Shore.
* There is absolutely no worthwhile patronage (town wise) between Geelong and Ararat on the sg line.
* One sg train set could run 2 return trips Ararat/Dimboola daily, whereas running through to Melbourne would double the rolingstock requirement.
* ARTC would not want valuable sg pathing space closer into Melbourne being hogged up by passenger services, when they could run local port shuttle services etc .

Speedwise beyond Ararat the Track is 60kg on wooden sleepers CWR with 3 position CTC signalling . The heaviest mainline G locos are allowed 115 kmh with loco hauled passenger trains . DRC's with a lighter axle load could expect to be allowed at least 130 kmh subject to suitability of signal sighting and adjustment of lx warning times .
 
s
jemo27 Junior Train Controller   Joined: Jan 12, 2007
Last Visited: Oct 25, 2008
Location: Kulwin line


contact

post
Posted: Sun Aug 31, 2008 3:42 pm
what about re-opening Stawell station
 
s
ARG706 Chief Commissioner   Joined: Jun 03, 2005
Last Visited: Dec 1, 2008
Location: City of doomsayers


contact

post
Posted: Sun Aug 31, 2008 4:13 pm
kuldalai wrote:

The Victorian Government would be better putting a 2 car Vlocity on sg and operate that between Dimboola & Ararat two return trips a day connecting cross platform at Ararat with bg trains to/from Melbourne, than continuing to pour money into ANR's coffers for six trips a week at times that are not all that attractive to Victorian travellers .


Who? Confused
 
s
witsend Chief Commissioner   Joined: Jan 01, 2004
Last Visited: Nov 29, 2008
Location: The Beautiful Copper Coast, and sometimes, just north of Pt. Pirie


contact

post
Posted: Sun Aug 31, 2008 4:23 pm
ARG706 wrote:
kuldalai wrote:

The Victorian Government would be better putting a 2 car Vlocity on sg and operate that between Dimboola & Ararat two return trips a day connecting cross platform at Ararat with bg trains to/from Melbourne, than continuing to pour money into ANR's coffers for six trips a week at times that are not all that attractive to Victorian travellers .


Who? Confused


Good point. Should be Great Southern Railway.



Regards,

Samuel Wittwer
Member - LC of Yorke Peninusula Rail
 
s
ZH836301 Chief Commissioner   Joined: Apr 26, 2006
Last Visited: Dec 1, 2008
Location: BleakCity


contact

post
Posted: Sun Aug 31, 2008 8:10 pm
jemo27 wrote:
what about re-opening Stawell station

Why?
 
s
Deep Throat Chief Commissioner   Joined: Mar 21, 2004
Last Visited: Dec 1, 2008
Location: Hanging out with Donald Snerd


contact

post
Posted: Sun Aug 31, 2008 8:27 pm
ZH836301 wrote:
jemo27 wrote:
what about re-opening Stawell station

Why?
Why not?



Anonymous - and proud of it.
 
s
ZH836301 Chief Commissioner   Joined: Apr 26, 2006
Last Visited: Dec 1, 2008
Location: BleakCity


contact

post
Posted: Sun Aug 31, 2008 8:35 pm
Doesn't really seem worthwhile for only three services each way per week.

(You'd also need to convince GSR to stop there in the first place)
 
s
NathanCastle Assistant Commissioner   Joined: Dec 11, 2007
Last Visited: Nov 24, 2008
Location: Gippsland


contact

post
Posted: Sun Aug 31, 2008 10:12 pm
kuldalai wrote:
If and when any sg VLP service is provided on the Western line to points beyond Ararat it would almost certainly be a shuttle DRC service by sg Sprinter or Vlocity because run as a shuttle service with cross platform connection at Ararat with bg services to/from Melbourne :
* Faster than running via North Shore.
* There is absolutely no worthwhile patronage (town wise) between Geelong and Ararat on the sg line.
* One sg train set could run 2 return trips Ararat/Dimboola daily, whereas running through to Melbourne would double the rolingstock requirement.
* ARTC would not want valuable sg pathing space closer into Melbourne being hogged up by passenger services, when they could run local port shuttle services etc .


I think V/lINE is happy with their coaches beyond Ararat.
If a V/Line train was to go beyond Ararat why would It go to Dimboola ?
Dimboola has a population of about 1500 as Horsham has about 30'000 ?



This proposed carbon trading scheme Is going to ruin the economy of Australia. "Dump It Now"

65 miles from Flinders Street Station Melbourne and 703 feet above sea level
 


Last edited by NathanCastle on Tue Sep 02, 2008 8:36 pm; edited 1 time in total
s
thadocta Chief Train Controller   Joined: Apr 18, 2004
Last Visited: Dec 2, 2008


contact

post
Posted: Tue Sep 02, 2008 7:51 pm
Deep Throat wrote:
ZH836301 wrote:
jemo27 wrote:
what about re-opening Stawell station

Why?
Why not?
It would be a gift!

Sorry, a thousand apologies, I will go back to where I came from now.

Dave
 
s
fullofrubbish Assistant Commissioner   Joined: Mar 14, 2007
Last Visited: Dec 1, 2008
Location: Parkville


contact

post
Posted: Tue Sep 02, 2008 8:49 pm
Any Railpagers yet had a go on the Overland with Vline tickets?
 
s
hidden Chief Train Controller   Joined: Feb 08, 2005
Last Visited: Nov 26, 2008


contact

post
Posted: Tue Sep 02, 2008 9:16 pm
witsend wrote:


Two things there, ParkesHub.

1) As the line is only rated for 115km/h, the V'locity would only be charged the same rate as the Current Overland, but with a lower variable GTK charge. Your V/Line driver would also need to be route qualified with the ARTC Rules,
ARTC use Victorian rules this side of Dimboola Loop.
witsend wrote:
and appropriate radios for communicating with ARTC Mile End,
Channel 6 on the train to base.
witsend wrote:
as well as other Safeworking requirements as defined by ARTC.
No LSDU fitted for SAS working
witsend wrote:
This would make one very special V'Locity, and a very special driver or two.

Most Drivers at V/Line have in the past been qualified from Melbourne to Dimboola and the relevant Safe working systems. It would take SFA to retrain enough drivers to run this service, whether they would bother is the real question.



"When one person suffers from a delusion, it is called insanity. When many people suffer from a delusion it is called Religion."
..........Robert M. Pirsig
 
s
richiebogie Junior Train Controller   Joined: Aug 29, 2006
Last Visited: Nov 28, 2008


contact

post
Posted: Fri Sep 12, 2008 6:53 pm
A morning SG shuttle from Mt Gambier to Portland to Hamilton to Ararat, wait for the train from Melbourne and then continue to Stawell and Horsham and back in the afternoon, could complement another shuttle going in the other direction.

These are all reasonable sized towns that deserve a bit of a rail revival....

Then again, the coach could be quicker and smoother...

and we're not in Europe:

 
s
Display from:   

Post new thread Reply to thread Railpage Australia™ Forum Index -> Victoria
Page 3 of 3  [ Previous thread ] :: [ Next thread ] Goto page Previous  1, 2, 3

All times are GMT + 10 Hours




Jump to:  
You cannot post new threads in this forum
You cannot reply to threads in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



Powered by phpBB 2.0.6 © 2001 phpBB Group

Theme images and concept © 2004 by Michael Greenhill and Railpage, All Rights Reserved.
Version 2.0.6 of PHP-Nuke Port by Tom Nitzschner © 2002 www.toms-home.com
Forums ©



Web site powered by PHP-NukeAll logos and trademarks in this site are property of their respective owner
The comments are property of their posters, all the rest is © 2003-2008 Interactive Omnimedia

You can syndicate our news using the news ticker or one of the RSS feeds
Web site engine's code is Copyright © 2003 by PHP-Nuke. All Rights Reserved.
PHP-Nuke is Free Software released under the GNU/GPL license.
Page Generation: 0.691 Seconds -- Current Server Load: 0.74%