• Login to Railpage
  • Information
    • Lineside Locations
    • Liveries
    • Locomotives
    • Organisations
    • Railcams
    • Sightings
  • Correspondence
    • Forums
    • News Index
    • News Archive
    • Polls
  • Content
    • Photos
    • Photo competitions
    • Old gallery
    • Jobs
    • Downloads
    • Timetables
    • Links
    • Events Calendar
    • Rail Passes
    • Railpage Websites
  • Website
    • Ideas
    • Advanced Search
    • Statistics
    • Forums Statistics
    • Bookmarklets
    • Feedback
    • Copyright
    • Membership List
    • Platform Status
    • Donate
    • Twitter
  • Help
    • Glossary
    • Terms of Use
    • Privacy Statement
    • Rules for Posting
    • Website Help & FAQ

Railpage

 

 
  • Home
  • Forums
  • Signalling and Infrastructure
  • $10 Million to correct a $27 Million dollar mistake
    • About Railpage
    • Railpage Australia™
    • Help For Beginners
    • Locations
    • News
    • Australian Railway News
    • New South Wales
    • Sydney Suburban
    • Victoria
    • Melbourne suburban
    • Queensland
    • South Australia
    • Tasmania
    • Western Australia
    • NT
    • ACT
    • Operators
    • Locomotives and Rolling Stock
    • Signalling and Infrastructure
    • Sightings
    • General
    • Australian Rail Employment
    • Trams and Light Rail
    • Simulator Forums
    • MSTS General Discussions
    • MSTS Routes
    • MSTS 3D
    • Trainz General Discussions
    • MetroMSTS Projects
    • MS Train Simulator X
    • Open Rails
    • BVE Trainsim
    • Train Simulator
    • Model Railways
    • Model Railways - General Discussions
    • Special Interest Groups
    • Australian Miniature Railways
    • Gheringhap Loop
    • Railway Archaeology
    • Railway Photography
    • Radio and Scanning Discussions
    • RTSA
    • Other Transport
    • The Bogies
    • Railway Preservation and Tourism
    • Preservation and Tourist Railways
    • International Railway News
    • International Discussion
    • General Forums
    • The Lounge
    • Test Forum
    • Armchair Operators
    • Archived Threads
    gordon_s1942 posted 16 Jun 2018 16:07
    Posted in Signalling and Infrastructure » $10 Million to correct a $27 Million dollar mistake

    $27 Million was what was quoted as the cost of converting from Double to Single line.
    Gossip was it cost more but I never heard any amount ever quoted if it did.
    The previous UP main line was chosen to be the new Main line with the Down Main to be removed.
    However at both Rydal and Tarana, the DOWN platforms are used for passenger usage.
    The new Main Line has been 'moved' in several places within the confines of the double line road bed to suit a better lie.
    This also would have covered the works needed from the west end of Wallerawang platform to join the Up and Down together and the main to Branch junction at Wallerawang West.
    Cabling, new points, motors, signals etc and the new relay/control building.
    Tarana would have required a new set of motorised points where the UP and down join, motors on the UP refuge and new signals, relay/control building.

    I was remiss and didnt state $21.8 Million has been allocated to do BOTH crossings and as no amount per Crossing Loop was given, I just divided that by 2 to get $10 Million I quoted in the heading.

    Edit history

    Edited 16 Jun 2018 16:10, 3 years ago, edited by gordon_s1942

    $27 Million was what was quoted as the cost of converting from Double to Single line.
    Gossip was it cost more but I never heard any amount ever quoted if it did.
    The previous UP main line was chosen to be the new Mail line with the Down Main to be removed.
    The new Main Line has been 'moved' in several places within the confines of the double line road bed to suit a better lie.
    This also would have covered the works needed from the west end of Wallerawang platform to join the Up and Down together and the main to Branch junction at Wallerawang West.
    Cabling, new points, motors, signals etc and the new relay/control building.
    Tarana would have required a new set of motorised points where the UP and down join, motors on the UP refuge and new signals, relay/control building.

    I was remiss and didnt state $21.8 Million has been allocated to do BOTH crossings and as no amount per Crossing Loop was given, I just divided that by 2 to get $10 Million I quoted in the heading.

    About this website

    Railpage version 3.10.0.0037

    All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.

    You can syndicate our news using one of the RSS feeds.

    View mobile site

    Stats for nerds

    Gen time: 0.3004s | RAM: 5.73kb