It is interesting that they have responded in the way they have given that though. I would have expected something specifically about the various feasibility studies or SRL in response.
~(edit) If it is relatively inexpensive for them to design the Busway with possibly far future transition in mind I don't see a reason not too, although that may well be far more difficult to do than I believe it to be.
Edited 09 Feb 2019 12:45, 2 years ago, edited by Goose13
It is interesting that they have responded in the way they have given that though. I would have expected something specifically about the various feasibility studies or SRL in response.
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.5025s | RAM: 5.69kb