• Login to Railpage
  • Information
    • Lineside Locations
    • Liveries
    • Locomotives
    • Organisations
    • Railcams
    • Sightings
  • Correspondence
    • Forums
    • News Index
    • News Archive
    • Polls
  • Content
    • Photos
    • Photo competitions
    • Old gallery
    • Jobs
    • Downloads
    • Timetables
    • Links
    • Events Calendar
    • Rail Passes
    • Railpage Websites
  • Website
    • Ideas
    • Advanced Search
    • Statistics
    • Forums Statistics
    • Bookmarklets
    • Feedback
    • Copyright
    • Membership List
    • Platform Status
    • Donate
    • Twitter
  • Help
    • Glossary
    • Terms of Use
    • Privacy Statement
    • Rules for Posting
    • Website Help & FAQ

Railpage

 

 
  • Home
  • Forums
  • Melbourne suburban
  • Rail link to Doncaster
    • About Railpage
    • Railpage Australia™
    • Help For Beginners
    • Locations
    • News
    • Australian Railway News
    • New South Wales
    • Sydney Suburban
    • Victoria
    • Melbourne suburban
    • Queensland
    • South Australia
    • Tasmania
    • Western Australia
    • NT
    • ACT
    • Operators
    • Locomotives and Rolling Stock
    • Signalling and Infrastructure
    • Sightings
    • General
    • Australian Rail Employment
    • Trams and Light Rail
    • Simulator Forums
    • MSTS General Discussions
    • MSTS Routes
    • MSTS 3D
    • Trainz General Discussions
    • MetroMSTS Projects
    • MS Train Simulator X
    • Open Rails
    • BVE Trainsim
    • Train Simulator
    • Model Railways
    • Model Railways - General Discussions
    • Special Interest Groups
    • Australian Miniature Railways
    • Gheringhap Loop
    • Railway Archaeology
    • Railway Photography
    • Radio and Scanning Discussions
    • RTSA
    • Other Transport
    • The Bogies
    • Railway Preservation and Tourism
    • Preservation and Tourist Railways
    • International Railway News
    • International Discussion
    • General Forums
    • The Lounge
    • Test Forum
    • Armchair Operators
    • Archived Threads
    True Believers posted 10 Feb 2019 20:24
    Posted in Melbourne suburban » Rail link to Doncaster

    Well if anyone remembers. The Doncaster Rail study looked at 3 options.

    A local stopping all station service, a rapid express service + Metro 2 or the orbital link. Not all 3 built at once.

    It preferred the rapid express + metro 2 option. Also I noted that they said decoupling the Mernda line would need to happen anyways in the future as patronage growth exceeds the maximum capacity even with HCS and capacity improvements on the Clifton Hill group.

    The current government doesn't want to build just a small section of the orbital loop, so in terms of patronage would be higher than shown by the Doncaster rail study team. Since the government preferences the orbital link, this means the other options will not go ahead.

    Although this section of the Orbital loop is not the first stages, so it is still unknown whether it would ever happen.

    Anyways at 4-6 billion dollars just to get the rail line to Doncaster park and ride, seems to be not much value for money for servicing just a small portion of Melbourne.



    https://www.youtube.com/watch?v=LROxxYDrgmI&t=0s&list=PLHIvsxgJ17w555xfwIiX5FjmNjbJ1OS6w&index=274

    Edit history

    Edited 10 Feb 2019 20:26, 2 years ago, edited by True Believers

    Well if anyone remembers. The Doncaster Rail study looked at 3 options.

    A local stopping all station service, a rapid express service + Metro 2 or the orbital link. Not all 3 built at once.

    It preferred the rapid express + metro 2 option. Also I noted that they said decoupling the Mernda line would need to happen anyways in the future as patronage growth exceeds the maximum capacity even with HCS and capacity improvements on the Clifton Hill group.

    The current government doesn't want to build just a small section of the orbital loop, so in terms of patronage would be higher than shown by the Doncaster rail study team. Since the government preferences the orbital link, this means the other options will not go ahead.

    Although this section of the Orbital loop is not the first stages, so it is still unknown whether it would ever happen.

    Anyways at 4-6 billion dollars just to get the rail to the park and ride of Doncaster, seems to be not much value for money for services just a small portion of Melbourne.



    https://www.youtube.com/watch?v=LROxxYDrgmI&t=0s&list=PLHIvsxgJ17w555xfwIiX5FjmNjbJ1OS6w&index=274

    About this website

    Railpage version 3.10.0.0037

    All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.

    You can syndicate our news using one of the RSS feeds.

    View mobile site

    Stats for nerds

    Gen time: 0.4572s | RAM: 5.73kb