What is gradient through Dombarton tunnel?
How long is it?
Is it diesel friendly?
Ideally it should be nearly level, just sloping enough to drain water from it.
Remember Cascade tunnel in USA! Built too steep and had to be replaced, and more.
If necessary move the junction up the hill to flatten the grade.
The diesels should be working at minimum power to keep fumes as low as possible.
Diesels can work flat out on the 1 in 30 grade in the open outside the tunnel.
Edited 15 Aug 2020 22:07, 5 months ago, edited by WimbledonW
What is gradient through Dombarton tunnel?
How long is it?
Is it diesel friendly?
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.3977s | RAM: 5.72kb