Egypt’s new monorail trains to be built in Derby
Bombardier to carry out Israel Railways coach overhaul
Railway opening forges ‘bonds of friendship’ between Afghanistan and Turkmenistan
Egypt plans Mediterranean to Red Sea high speed line
Saudi Arabia to build residential project THE LINE centred around walking
Siemens Mobility to design, install and commission first high-speed rail network in Egypt
Egypt signs MoU with Siemens for new 250km/h rail network
Afghanistan’s Aqina – Andkhoy extension inaugurated
Desiro HC EMUs en route to Tel Aviv
Etihad Rail Stage Two tracklaying underway
The UAE-based Etihad Rail has awarded a AED4.6bn ($1.25bn) civil works and construction contract for Package D of stage two of its rail network.
The contract was awarded to the China Railway Construction Corporation (CRCC) and National Projects and Construction (NPC) joint venture (JV).
Package D will connect the Fujairah and Khorfakkan ports with the rail network at Dubai-Sharjah border. It will span over 145km.
The JV will be responsible for building 15 tunnels through the Hajar Mountains, covering a length of 16km. They will also construct 35 bridges and 32 underpasses.
A rail network connection between Fujairah and Khorfakkan ports will allow for the transportation of around two million twenty-foot equivalent container units (TEUs) annually. The UAE expects this to boost international trade.
Etihad Rail will also transport 30 million tonnes of construction material to distribution centres in Abu Dhabi and Dubai every year.
This package will connect the ports to major centres for manufacturing, production and population.
Emirates News Agency quoted Sheikh Theyab bin Mohamed as saying: “The awarding of this contract is a highly significant achievement as Etihad Rail follows its path to progressing one of the most important and economically strategic projects in the UAE.
“While expanding a vital sector that constitutes the lifeline of our national economy, we continue to provide a safe, modern, and sustainable national railway network that meets the aspirations and expectations of our nation and its leaders, supporting the UAE’s position as a major link in the regional and global supply chain, and as a key player in the logistics system.”
In October, Etihad Rail awarded an AED1.6bn ($435.5m) systems and integration contract to Hitachi Rail STS for stage two of its rail network.
This June, Etihad Rail awarded contracts to connect Abu Dhabi and Dubai with a rail line.
The contracts have a total value of AED4.4bn ($1.2bn). They encompass both civil and track works in Packages B and C.
The post Etihad Rail awards $1.25bn contract for Package D work appeared first on Railway Technology.
This article first appeared on www.railway-technology.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.9512s | RAM: 6.47kb