Bombardier to carry out Israel Railways coach overhaul
Saudi Arabia to build residential project THE LINE centred around walking
Afghanistan’s Aqina – Andkhoy extension inaugurated
Siemens Mobility to design, install and commission first high-speed rail network in Egypt
Egypt plans Mediterranean to Red Sea high speed line
Etihad Rail Stage Two tracklaying underway
Iran inks deal to export rail tracks to Afghanistan
Derailment of track machine suspends rail traffic
Railway opening forges ‘bonds of friendship’ between Afghanistan and Turkmenistan
Egypt signs MoU with Siemens for new 250km/h rail network
UAE’s Etihad Rail has signed a contract to procure 38 locomotives from US-based Progress Rail Locomotive, a Caterpillar company.
The new procurement will increase Etihad Rail’s fleet to 45 locomotives.
In a Twitter post, Etihad Rail said: “Our transport capacity with the new fleet will increase up to 60 million tonnes per year reducing the truck journeys to 2.4 million journeys yearly.”
As agreed, Progress Rail will design, develop and supply 38 EMD locomotives, which will be equipped with powerful motors and technology to reduce carbon emissions by up to 80%.
The locomotives will also be designed to operate in the typically high temperatures and humid climates of the Gulf region.
The fleet will also feature air filtration systems to separate sand from the air intake and ensure smooth operations when the train passes through the desert.
Each of these locomotives will be capable of transporting a 100-wagon train.
Etihad Rail was established in June 2009 to operate and develop the national railway network in the UAE.
Last month, the company launched the construction works of Package A of Stage Two of the pan-Emirates railway network.
The scope of works includes the construction of a 139km stretch from Ruwais to Ghuweifat.
In December 2019, the operator awarded civil works and construction contract to deliver Package D of Stage Two of its rail network.
The AED4.6bn ($1.25bn) contract was awarded to the joint venture of China Railway Construction (CRCC) and National Projects and Construction (NPC).
Package D works will connect the Fujairah and Khorfakkan ports with the rail network at the Dubai-Sharjah border.
The post Etihad Rail to procure 38 locomotives from Progress Rail appeared first on Railway Technology.
This article first appeared on www.railway-technology.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.9416s | RAM: 6.9kb