RTA Dubai to trial drone inspection for Dubai Metro tunnels
Egypt plans Mediterranean to Red Sea high speed line
Etihad Rail Stage Two tracklaying underway
First U-Girder erected on priority corridor of Kanpur Metro Rail project
Esfahan – Ahvaz rail link memorandum signed
King inaugurates Haramain High Speed Rail
In-depth Analysis: UAE celebrates 10th anniversary of Dubai Metro operations
Afghanistan’s Aqina – Andkhoy extension inaugurated
Wagons delivered from Poland to Saudi Arabia
Lebanon railway revival discussed
The project team of Afcon Infrastruture and Uttar Pradesh Metro Rail Corporation (UPMRC) today launched first U-Girder on 9-km priority corridor of Kanpur Metro Rail project.
The first U-girder of the project has been erected for the Metro viaduct on Pillar No. 17 and 18 near IIT Kanpur on the Priority Section of Kanpur Metro project in the presence of Rajendra Kumar Tiwari, Chief Secretary, Government of Uttar Pradesh along with Kumar Keshav, Managing Director, UPMRC and other senior officials.
@OfficialUPMetro erected on first U-Girder of first priority corridor of Kanpur Metro Rail project today. U-girder launching program was witnessed by UP chief secretary Rajendra Kumar Tiwari and UPMRC MD Kumar Keshav and other metro officials.#KanpurMetro #UPMRC #BreakingNews pic.twitter.com/DHUuhW0ocv
— Urban Transport News (@urbantransnews) August 11, 2020
“The U-girders provide the top deck of Metro viaduct on which track, traction and signaling system are laid for movement of Metro trains. A total of 638 U-girders are to be laid on the 9 KMs long Priority Section (IIT Kanpur-Motijheel). The erection of the girder in just 8½ months since start of the piling work for the project, will be a step forward in the construction of Kanpur Metro Rail project,” said in the official release.
Under the supervison of Uttar Pradesh Metro Rail Corporation (UPMRC), the civil works of the Kanpur Metro project are being executed at a very fast pace. So far, 1,300 piles completed on the priority setion of the project. Foundation is also ready for the workshop shed of Kanpur Metro’s depot at Government Polytechnic’s land by KSM Bashir Mohd and Sons. This depot will provide stabling and mainetnance facilities to Bombardier’s Rolling Stock and feed metro trains for Corridor I of Kanpur Metro Rail project.
The Kanpur Metro is the first such metro project in the country where double T-girders are being used to prepare the concourse level of the Metro stations to speed up the civil construction and at the same time enhance the beauty of the structure.
The post First U-Girder erected on priority corridor of Kanpur Metro Rail project appeared first on Urban Transport News.
This article first appeared on www.urbantransportnews.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 1.512s | RAM: 6.5kb