Malton GO Station: Temporary changes to station access, starting January 7
Brampton Transit revises services, starting January 4
Snapshot of Greenboro Station - January 8, 2021
GO suspending Niagara train service, January 9
Canadian National ‘pleased’ as rail blockade ends
Record Grain Moves Continue for CN, CP
Subway closes early, January 18 to 21: Finch to Eglinton
Vancouver port rail dwell times rise on Asia import surge
Canadian Pacific (CP) Closes Detroit River Rail Tunnel Buyout
Rail blockades created huge tab for Canadian grain producers, industry says
The extension will run from a new station at Nait, north through Blatchford. Phase 2 will run 9.4km from Blatchford, connecting with key activity centres along 113A Street and then west along 153 Avenue to Campbell Road.
Blatchford is a new community development that will be located on the 216-acre site of the former city centre airport. The area will house 30,000 residents, and will be designed to use 100% renewable energy, and be carbon neutral, significantly reducing the area’s carbon footprint.
The extension is expected to carry 8000 passengers a day when it opens ins 2024 or 2025, rising to 17,600 within 20 years.
The $C 665m ($US 496.4m) Metro Line, which runs partially along the Capital Line and a 3.3km branch to Nait, opened in September 2015. In March last year, the Canadian government agreed to contribute more than $C 1bn through the Canada Infrastructure Plan to expand the network, including $C 127m for the first phase of the MLNW.
Much of the work on phase 1 will be taking place in undeveloped areas with minimal impact to the public. However, the realignment will require a closure of 109 Street between Princess Elizabeth Avenue and 120 Avenue to pedestrians and vehicles from June 15 until October.
The contractors and consultants involved in the project have adjusted their health, safety and environment plans to incorporate Covid-19 protocols and comply with Alberta Health directives and guidelines.
This article first appeared on www.railjournal.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 1.9664s | RAM: 6.49kb