All along the section between Epping and Thornleigh concrete "New Jersey Barrier" blocks are being place to reduce the risk of motor vehicles straying onto the running lines.
The rock cutting north of Cheltenham station on the NSFC side is being fitted with wire-netting and suitable posts, probably to protect the running line from rockfalls, when work starts to excavate the cutting for the third track.
All along the section between Epping and Thornleigh concrete "New Jersey Barrier" blocks are being place to reduce the risk of motor vehicles straying onto the running lines.
Too hard to put that in the existing NSFC construction thread was it?The NSFC thread is getting to be rather long, and there would be some sense in separating it into parts, with of course plenty of cross references.
Too hard to put that in the existing NSFC construction thread was it?