What to do with the Altona loop?

 
  True Believers Chief Commissioner

I just wanna have some kinda poll and discussion whether you think can be done to the Altona line.

Option A:
Close the rail line

Option B:
Close the rail line and replace with light rail

Option C:
Upgrade the line, by duplication in key sections

Option D:
Upgrade the line, then extend it out to Point Cook

Option E:
Run the Geelong line back unto the Werribee corridor and uses Metro 2 tunnels, Werribee uses the Altona loop (which is upgraded) and Williamstown use existing route

Option F:
Leave it as it is

I used to think it was a great idea to utilise the growing area of point cooke so the Altona line doesn't need a downgrade for its lack in patronage. The problem is extremely expensive and other projects are much more priority over this.

I don't think closing the line is great option because like the Upfield line it can be used to divert services.  Personally I am in favour of C and then eventually to option E when the opportunity comes.

Note Options A-C are medium term and D and E are much for long term investments.

Sponsored advertisement

  torrens5022 Junior Train Controller

I like the idea of linking the Altona line via Altona Meadows and Point Cook to a Werribee interchange and then you can run it via RRL back to the CBD so a giant loop from Footscray.  The Werribee main line will be used for the metro 2 tunnel and services will run to an electrified Geelong line to Waurn Ponds (and beyond).  This is very long term plan.  
Metro tunnel 2 will be used for Mernda to Werribee / Geelong (Waurn Ponds) services.
You could do interesting services on the new Western line, service patterns like all stops -  Glen Waverley - CBD - Footscray - Altona - Point Cook - Werribee - Tarneit - Footscray - CBD - Glen Waverley.
The metro plan will link Glen Waverley and Alamein lines with the Western Line  - http://i.imgur.com/4yxgDza.png -
The idea of the Geelong line going to Mernda via Metro 2 is better then the it going to South Yarra.
  Nightfire Minister for Railways

Location: Gippsland
Point Cook does not have an “e” on the end of Cook !
  Gauntlet Chief Commissioner

Location:
I'm voting for an upgrade with an emphasis on increasing maximum line speed from Newport-Seaholme and Laverton-Westona, and enough duplication to easily run a 15 minute service.
All Warrnambool trains should run via Galvin, but I'll have to review that idea when V/Locity trains start running there.
  x31 Chief Commissioner

Location: gallifrey
What is the problem this thread is trying to solve?
  True Believers Chief Commissioner

@Nightfire fixed

@x31 The problem it is trying to solve is increasing the patronage on the Altona line and whether the improvements onto the Altona line are necessary or should look into other solutions to make it viable.
  John.Z Assistant Commissioner

What is the problem this thread is trying to solve?
x31
The Altona line does not serve enough people to justify running trains to it at the cost of those living in Werribee and surrounds. One way of increasing its use would be to expand the catchment area of the line by extending it into growth corridors (Point Cook / Werribee South / Werribee Tertiary Education precinct etc.) Just like is happening at the moment with the Mernda Line.
  TOQ-1 Deputy Commissioner

Location: Power Trainger
Run Werribee trains non-stopping between Newport and Footscray. Altona Loop and Williamstown trains stop all stations.
  Mr Gus Meister Junior Train Controller

You could actually replace it with Light Rail and have Light Rail go all the way out to Point Cook via Sanctuary Lakes.
  railblogger Chief Commissioner

Location: At the back of the train, quitely doing exactly what you'd expect.
Develop the area around the line and revamp the Hobsons Bay bus system?
  John.Z Assistant Commissioner

You could actually replace it with Light Rail and have Light Rail go all the way out to Point Cook via Sanctuary Lakes.
Mr Gus Meister
Would an extention of the 82 Tram to Altona - Point Cook / Williamstown via the current Rail reserve (taking over Newport-Footscray once MT2 opens) be something that could be considered?
  Mr Gus Meister Junior Train Controller

I'll map it out.
  x31 Chief Commissioner
  jdekorte Deputy Commissioner

Location: Near Caulfield Station
Run Werribee trains non-stopping between Newport and Footscray. Altona Loop and Williamstown trains stop all stations.
TOQ-1
This is the current running anyway (at least for weekdays).  Most Werribee/Williamstown/Laverton trains are ex Frankston Line as part of the Cross-City service and don't go through the loop.

Werribee - Flinders St, Southern Cross then Express North Melbourne - Footscray - Newport - Laverton then stops all stations to Werribee

Laverton - Stops all stations from Flinders St to Laverton via Altona

Williamstown - Stops all stations from Flinders St to Williamstown.

As it stands with the connection to the Frankston line there is a roughly ten minute frequency from Frankston - Newport which splits to a twenty minute frequency to Williamstown or Werribee. Does the Altona Loop run as a shuttle off-peak?
  rokaifly Station Master

Altona loop trains upgraded to run every 20min from flinders to Laverton via Altona during weekdays interpeak period only, since the timetable change on 27th August. Still runs as shuttle service on weekends
  True Believers Chief Commissioner

Altona loop trains upgraded to run every 20min from flinders to Laverton via Altona during weekdays interpeak period only, since the timetable change on 27th August. Still runs as shuttle service on weekends
rokaifly
Umm no, Werribee trains on the weekends surprisingly use the Altona loop section. This also applies on late night services as well.
  True Believers Chief Commissioner

https://drive.google.com/open?id=1T6prJwUehb0iaAHt8gt5GU4mcm4&usp=sharing
Mr Gus Meister

Looking at the distances, extending the light rail tram route 57 out to Kelior east seems like a better idea, and maybe it could connect on the proposed Airport line running along that freight line. That would be kinda off topic but seems like a nice option for discussion.
  Mr Gus Meister Junior Train Controller

We could have the light rail go over the Yarra, and then around Fishermans Bend.
  The Vinelander Minister for Railways

Location: Ballan, Victoria on the Ballarat Line
Yep...Chidda Bang has definitely returned...
  True Believers Chief Commissioner

Yep...Chidda Bang has definitely returned...
The Vinelander
Who is Chidda bang?
  rokaifly Station Master

Shizzz I know that had a major brain fade
  Gauntlet Chief Commissioner

Location:
On weekends they should close Seaholme and Aircraft, and then run a  fifteen minute to Werribee via Altona when the duplication and level crossing at Kororoit Creek Road is completed.
  x31 Chief Commissioner

Location: gallifrey
On weekends they should close Seaholme and Aircraft, and then run a  fifteen minute to Werribee via Altona when the duplication and level crossing at Kororoit Creek Road is completed.
Gauntlet

Would trains still stop at Altona?
  True Believers Chief Commissioner

On weekends they should close Seaholme and Aircraft, and then run a  fifteen minute to Werribee via Altona when the duplication and level crossing at Kororoit Creek Road is completed.

Would trains still stop at Altona?
x31
That means if you heading towards Werribee after Newport it stops at Altona, Westona, Laverton, WilliamsLanding, Hoppers, Werribee, skipping Aircraft and Seaholme. Currently on weekends it stops at all stations including the ones on the Altona loop.