Good grief, you're right.Of course if there were 365,000 clips at 2 clips per sleeper, there should be about 182,500 sleepers.Except there are typically 4 clips per sleeper, one on the gauge side of each rail foot, one on the field side.![]()




For "unofficial" track diagram of P2N see https://www.sa-trackandsignal.net/Pdf%20files/ARTC/AR471.pdf.
There are three crossing loops from 1850m to 2050m, not including the turnouts. Also a few wheat sidings and a siding for track machines. Strangely two of the 1100m long wheat sidings is signalled almost as if it were a crossing loop, albeit with catchpoints and motor points.