Metro Rail Tunnel - Building Thread

 
  tayser Deputy Commissioner

Location: Melbourne
About halfway through the premier of about 5 hours of raw construction video on the entire project.  



https://www.youtube.com/watch?v=ptWYx6oASps

Sponsored advertisement

  Tii Locomotive Driver

This appeared on the Metro tunnel website update dated May 3. Part of the detail on tunnelling says 3 of the 4 TBMs are now at the Town Hall station. The tracker which always lags behind says only 2 but that's not unusual. I'm guessing a press release shortly. ??

https://metrotunnel.vic.gov.au/__data/assets/pdf_file/0008/523637/Town-Hall-construction-update,-May-2021.pdf
  bevans Site Admin

Location: Melbourne, Australia


This looks given the size to be a platform access for walking of passengers?
  justarider Chief Commissioner

Location: Released again, maybe for the last time??


This looks given the size to be a platform access for walking of passengers?
bevans
Check your glasses Brian, and then look at the man walking inside the tunnel:lol:Laughing. He's that little orange dot.

cheers
John
  bevans Site Admin

Location: Melbourne, Australia
Th westgate tunnel project builders now wanting to build the suburban rail loop early works https://www.railpage.com.au/news/s/construction-giants-bid-for-2-2bn-in-suburban-rail-loop-early-works
  kitchgp Chief Commissioner

Arden only has an eastern entrance at this stage.
  tayser Deputy Commissioner

Location: Melbourne
  bevans Site Admin

Location: Melbourne, Australia
  bevans Site Admin

Location: Melbourne, Australia
tayser

Where is that damn noise coming from?
  Tii Locomotive Driver

Yep the TBM got to Town Hall on the weekend. Now where is the final one?

https://www.premier.vic.gov.au/focus-turns-stations-metro-tunnels-towards-completion
  freightgate Minister for Railways

Location: Albury, New South Wales
With the machines reaching townhall does this mean the boring has completed ?
  lkernan Deputy Commissioner

Location: Melbourne
With the machines reaching townhall does this mean the boring has completed ?
freightgate
Unless they hang a 90 degree turn and start metro 2, yes.
  Tii Locomotive Driver

With the machines reaching townhall does this mean the boring has completed ?
freightgate
No, one more is still working its way from State Library to Town Hall. Nearly there perhaps at the end of the month.
  LeroyW Junior Train Controller

Location: Awaiting MM2


Nearly there... less than 200 rings to go for Meg and we're all done a tunneling!
  davesvline Chief Commissioner

Location: 1983-1998
Was there any intention of continuing metro 2 from where metro 1 finishes?? I ask, as I don’t think the TBMs were being removed from the tunnels? That being a probable, I would think IF metro 2 starts there, then those TBMs could possibly be reactivated and just continue on with metro 2 at that time??

Or not?? Figured I’d ask.

Regards
  Tii Locomotive Driver

Was there any intention of continuing metro 2 from where metro 1 finishes?? I ask, as I don’t think the TBMs were being removed from the tunnels? That being a probable, I would think IF metro 2 starts there, then those TBMs could possibly be reactivated and just continue on with metro 2 at that time??

Or not?? Figured I’d ask.

Regards
davesvline
Unfortunately no. There is no plan for Metro 2 at present. It's just speculation. The TBM's are dismantled and removed for either recycling or scrap at the end. Only a small part remains as part of the tunnel itself, but most is removed. It could potentially be partly removed for the suburban rail loop tunnelling next year but no announcements on that yet or what size those tunnels will be I believe. Does seem a waste they haven't been repurposed in some way.
  Lockie91 Assistant Commissioner

Was there any intention of continuing metro 2 from where metro 1 finishes?? I ask, as I don’t think the TBMs were being removed from the tunnels? That being a probable, I would think IF metro 2 starts there, then those TBMs could possibly be reactivated and just continue on with metro 2 at that time??

Or not?? Figured I’d ask.

Regards
Unfortunately no. There is no plan for Metro 2 at present. It's just speculation. The TBM's are dismantled and removed for either recycling or scrap at the end. Only a small part remains as part of the tunnel itself, but most is removed. It could potentially be partly removed for the suburban rail loop tunnelling next year but no announcements on that yet or what size those tunnels will be I believe. Does seem a waste they haven't been repurposed in some way.
Tii
The majority of the TBM is repurposed. It is just the outer shields and the cutting head that are replaced. The technology, hydraulics, mechanics and living quarters all get pulled out.

It could sit in storage for years, be refurbished, bolt a new cutting head and off it goes onto SRL, MARL or MM2.

As for tunnel size, I don't suspect it will be much different from MM1. Sydney Metro has been criticised for not having an emergency gangway through the tunnel. Even if SRL runs with a high frequency 4 car set, the diameter of the tunnel still needs to be able to accomodate the plethora of services.

Lockie
  bevans Site Admin

Location: Melbourne, Australia
  John.Z Assistant Commissioner

bevans
The station platforms are coming together quite nicely here too.
  Tii Locomotive Driver

I thought there was a thread on High Capacity Signalling but I didn't find one in the search function, as as it is part of the metro project, I'd ask the questions here.

The trial on the Mernda line at night on HCS, just keeps going on with new dates announced until the end of August 2021 now. Is it going to plan ? Or have their been issues that mean more testing ?

Happy to be redirected to a pre existing discussion
  ngarner Deputy Commissioner

Location: Seville
I thought there was a thread on High Capacity Signalling but I didn't find one in the search function, as as it is part of the metro project, I'd ask the questions here.

The trial on the Mernda line at night on HCS, just keeps going on with new dates announced until the end of August 2021 now. Is it going to plan ? Or have their been issues that mean more testing ?

Happy to be redirected to a pre existing discussion
"Tii"


From what I've read (sorry, can't remember exactly where to provide a link) they are about 50% of the way through testing. The use of two trains was introduced not all that long ago after initial testing only used the one. I take that to mean that they are on track with everything

Neil
  Tii Locomotive Driver

I thought there was a thread on High Capacity Signalling but I didn't find one in the search function, as as it is part of the metro project, I'd ask the questions here.

The trial on the Mernda line at night on HCS, just keeps going on with new dates announced until the end of August 2021 now. Is it going to plan ? Or have their been issues that mean more testing ?

Happy to be redirected to a pre existing discussion


From what I've read (sorry, can't remember exactly where to provide a link) they are about 50% of the way through testing. The use of two trains was introduced not all that long ago after initial testing only used the one. I take that to mean that they are on track with everything

Neil
ngarner
Ah OK, just seemed a never ending routine of adding more and more dates. Once it is done and rolled out on the Sunbury-Pakenham line (post metro tunnel), can it be applied to other lines ?, or does it need to be tested on each line separately. The original PTV network plan suggested Sandringham and Clifton Hill group would be used but that was back in 2012.
  ngarner Deputy Commissioner

Location: Seville
I thought there was a thread on High Capacity Signalling but I didn't find one in the search function, as as it is part of the metro project, I'd ask the questions here.

The trial on the Mernda line at night on HCS, just keeps going on with new dates announced until the end of August 2021 now. Is it going to plan ? Or have their been issues that mean more testing ?

Happy to be redirected to a pre existing discussion


From what I've read (sorry, can't remember exactly where to provide a link) they are about 50% of the way through testing. The use of two trains was introduced not all that long ago after initial testing only used the one. I take that to mean that they are on track with everything

Neil
ngarner
Ah OK, just seemed a never ending routine of adding more and more dates. Once it is done and rolled out on the Sunbury-Pakenham line (post metro tunnel), can it be applied to other lines ?, or does it need to be tested on each line separately. The original PTV network plan suggested Sandringham and Clifton Hill group would be used but that was back in 2012.
"Tii"


Testing it where they are has no connection to the Pakenham to Sunbury line, so, logically, once it has passed all tests, and is accredited for use in Victoria, it ought to be able to be applied to any line that 'the-powers-that-be' deem necessary or desirable. This assumes they're willing to stump up the cash to install it on both line and any/all of the trains that will run on it. That is going to be the catch as only the HCMT/Evolutions are getting it now and, I imagine that, retro-fitting will not be cheap

Neil
  ngarner Deputy Commissioner

Location: Seville
And they you go; you asked and here's an answer

https://www.railexpress.com.au/from-lab-to-live/

worth a read

Neil