Lockie91

Member since Jan 10, 2018

Last visited 34 minutes ago

  View profile

IMO doesn't count for much.

MM1 Business case includes a fleet cascade plan, with "next gen suburban trains" going to Cross City Group and Craigieburn/Upfield. Semiens get moved to Sandringham, al ...

Another flop from the Andrews Government. Great at building projects, pathetic at adding services.

Positives are the cleaning up of the cross city group and the boost to Frankston and Dandenong Gr ...

[quote=kuldalai][quote]More news from LXRP.

Werribee St removal is going to complete by the end of this summer, which is quite a contrast to the originally proposed 2022

[url=https://levelcrossings. ...

[quote][quote][quote][quote]So why start with 7 carriages? If they have to add a few extra carriages anyway when MM1 opens then why not just run 6 cars in the interim and avoid all the hassle 7 carru ...

[quote=John.Z][quote]All very good and well for the libs to release a wish list of projects when they have no responsibility.

Lockie[/quote]Not sure what's with the bashing, they're the opposition ...

[quote=Carnot]So, it sounds like 6 tph added to existing Metro line from Albion to MM1 will be airport trains (HCMT).

MM1 will have a max capacity of 24 tph, so a big percentage of those will end u ...

[quote=Rossco T]While we are at it, here are the transport projects that the Coalition want included in the State Budget.

[url=http://daviddavis.com.au/media-release-catch-up-train-services-for-fas ...

[quote=tayser]Lots of comments re: Monash seem to be missing what was said in the press conference: station location also took into account of existing sensitive buildings and services and with Monash ...

Not even a sod turned yet and the NIMBYs are out.

[url=https://www.theage.com.au/national/victoria/2-2-billion-committed-for-first-section-of-suburban-rail-loop-20201116-p56evy.html]Families in sh ...

[url=https://www.theage.com.au/national/victoria/metro-tunnel-digging-running-seven-months-late-20201115-p56epy.html]Metro Tunnel 7 months late

The plot thickens. Seems like a total dogs breakfas ...

Station locations are odd if you think of them as just stations.

They wont be your run of the mill suburban stations. I would not be surprised as has been mentioned, if entire blocks of were acqui ...

[quote=reubstar6][quote]Also confirms location of the start point will be Southland, with a station marker on the corner of Bay and Reserve roads.[/quote]

I hope it's not there and closer to the exis ...

[quote=John.Z][quote]It is an exiting project but concerned the loop will not access Chadstone Shopping Centre?[/quote]Nope.

Chadstone is best served as an extension of the Alamein Line and the Lig ...

[quote=bevans]Today we're announcing $2.2 billion to kickstart Stage One of the Suburban Rail Loop. We're also locking in locations for the six underground stations as part of Stage One – and confir ...

$2.2 Billion announced for early works package on Stage 1 this morning.

No formal media release from the premier as yet, but a flash new video has gone up on Facebook.

Also confirms location o ...

What is the benefit of having a 3 minute service to places like Hurstbridge, Lilydale, Sunbury or all the other outer suburban termi? As has been mentioned, all pointless if your local bus still runs  ...

[quote=railblogger][quote][quote]The alternative of course is to close or relocate the sidings.[/quote]Isn't that the reason why a large stabling facility was built at Calder Park ?[/quote]I thought t ...

[quote=ngarner]With the Vic Auditor-General not convinced of the value for money of these PPP I'm increasingly of the opinion that, as someone else has already written, that state governments should d ...

[quote]

At Sunbury the new construction compound off Horne Street has come to life with a small amount of workers and new site sheds being installed. A concrete foundation has been laid next to the h ...

[quote=BrentonGolding]Yesterday evening was my last V/Line train trip for a fortnight as the shutdown kicked in.

A truly staggering amount of materials, plant and equipment scattered along the line ...

[quote=Op Kronos][quote]This is quite interesting news.

"The Level Crossing Removal Authority (LXRA) is preparing a business case for the removal of the Glenferrie Road, Kooyong and Tooronga Road, ...

[quote=historian][quote]Consultation has started for Glen Huntley removals.

Of insert is the acquisition of nine properties near Queens Ave & Neerim Road to facilitate a trench that contains 4 tra ...

Consultation has started for Glen Huntley removals.

Of insert is the acquisition of nine properties near Queens Ave & Neerim Road to facilitate a trench that contains 4 tracks, one additional then ...

In today's presser Andrews was thrown a question about when he might announce Airport Rail. The reporter got the usual 'when I'm ready' response. However, Andrews did add that he looked forward to ann ...

[quote=steve195][quote]Dec 13 TT pushed up till next year.

Not sure if that means the HCMT introduction is also delayed?[/quote]I would assume so considering they apparently can only go one way arou ...