Posted 26 Sep 2021 14:16 in Melbourne suburban by Tii

Melbourne Airport already has planned/approved and is in the prelim stage of a whole new airport drive pickup and set down point using the existing multi storey car park, to move traffic away from the ...

If we were replacing our current rolling stock tomorrow, then electrification on some routes would suit it. If the Velocity replacements are still a decade away, then other options might be more appro ...

Early days yet but hydrogen powered hybrids are used in Europe for just a handful of medium routes- Geelong would be in the realms of that. Rather then money on OLE to Geelong and Ballarat- maybe dies ...

Posted 06 Sep 2021 14:22 in Melbourne suburban by Tii

Driving by this morning, most of the skysail is in situ from Murray to Cramer st. North and south of that is nothing yet but the OLE has been modified for single track running on the DOWN track by the ...

[quote=Dangersdan707][quote]I think we should face the fact that not every level crossing will be removed. There will be cases where the alternative to the existing crossing will be technically very d ...

Posted 05 Sep 2021 02:02 in Melbourne suburban by Tii

[quote=Lockie91][quote][quote][quote]https://twitter.com/JamesMConlan/status/1432869823084515331[/quote]It's a disappointment if some have failed already for whatever reason. Hopefully they are replac ...

Posted 03 Sep 2021 10:15 in Melbourne suburban by Tii

[quote=bevans]Here we go again overthinking the obvious need for rail upgrades right through to Stony Point.

https://www.railpage.com.au/news/s/better-buses-suggested-rather-than-rail-extension/qu ...

Posted 03 Sep 2021 03:00 in Melbourne suburban by Tii

[quote=bevans]Level crossing removal works now well underway at Preston. First elevated beams and supporting pillars now in place between Cramer St and Murray Rd

[img]https://pbs.twimg.co ...

[quote=True Believers][quote][quote]A question to ponder on. After the current LX removals planned, there will be about 85 remaining or so. In some of the removals, some crossings are just closed and ...

[quote=Rossco T][quote]Cranbourne duplication is well into construction, that needed to be done first, business case development for Clyde rail is underway and the 2022 election might mean that could ...

A question to ponder on. After the current LX removals planned, there will be about 85 remaining or so. In some of the removals, some crossings are just closed and traffic diverted elsewhere in a diff ...

Posted 02 Sep 2021 09:39 in Melbourne suburban by Tii

When they install tress like they have do they include a watering system for the trees and other bushes?
bevans
I understand that rain water is collected from the station and used in som ...

[quote=8502]It is not adequate to focus on the metro systems without looking at a strategy for the V/Line system which is quite large in its own right. What is the plan to remove diesel trains from t ...

Posted 01 Sep 2021 21:38 in Melbourne suburban by Tii

https://twitter.com/JamesMConlan/status/1432869823084515331
bevans
It's a disappointment if some have failed already for whatever reason. Hopefully they are replaced soon  before it gets ...

Posted 30 Aug 2021 08:44 in Melbourne suburban by Tii

Wait for some grubby little smegbag C to vandalise it:evil:.

Nicely done in keeping the heritage value, even though that is detracted by the new overhead path.

Regards

davesvline

Va ...

Update on the 4 stages to complete the Bell-Preston skyrail project. A lot of work around Preston Station area currently as I drive by.

https://levelcrossings.vic.gov.au/media/publications/preston- ...

Posted 27 Aug 2021 08:49 in Melbourne suburban by Tii

[quote=aussie48]Really! Wiring looms made by Robots? Which weeties packet did you find that in. If you must know the truth then visit Cablex in Oakleigh who make all the HCMT Train Looms all by han ...

A Hazpt Youtube video shows those two sets on transfer to Geelong, hauled by two SSP T class, for scrapping according to the video



https://youtu.be/GVIo7ON3QLg

Neil

ngarner

They sh ...

[quote=mejhammers1][quote][quote]It's awful service really- the whole thing needs to be taken over and run at a state level everywhere to integrate properly and have faster routes. It's almost 2022 an ...

It's awful service really- the whole thing needs to be taken over and run at a state level everywhere to integrate properly and have faster routes. It's almost 2022 and still a lot of rubbish. I asked ...

Looking through the documents on planning for high rises and the Sth Geelong station precinct, I don't follow why the level crossing at Yarra street isn't removed and the station elevated in the rebui ...

[quote=Valvegear]The precast crossheads and beams must be saving a tremendous amount of on-site time. The time it would take to erect formwork, tie rebar, pour and then wait until the concrete cured d ...

Progress at Preston with Crossheads installed and L beams arriving this month. House demolition along the rail corridor also underway now.

https://levelcrossings.vic.gov.au/media/publications/works ...

Posted 04 Aug 2021 07:54 in Victoria by Tii

[quote=justarider][quote][quote][quote]More info and works underway for daily return services

[size=2]https://www.railpage.com.au/news/s/rail-to-shepparton-on-track[/size][/quote]Stage 3 is all abo ...

Posted 03 Aug 2021 14:32 in Victoria by Tii

More info and works underway for daily return services

https://www.railpage.com.au/news/s/rail-to-shepparton-on-track

bevans

Stage 3 is all about track upgrades isn't i ...