Forums

 
1 of 11 2 3 ... 9 10 11

Search found 258 matches

steve195

Member since Nov 23, 2014

Last visited yesterday

  View profile

[quote=John E]What was interesting further into this post was that he is in discussion with other stakeholders keen to get a connection built including Monash Uni and the owners of Chadstone and that ...

A bit of curiosity in Carnegie along the original flavour Skyrail(TM); there are some 'LXRP Public Open Space' construction works going on.. three years after the project was completed.

B ...

[quote=Mr. Lane][quote][quote]Do we definitely know the new trams will be shorter than the E class at only 22 meters as some people have said in this and other threads?

It seems a real backwards st ...

[quote=Mr. Lane]Do we definitely know the new trams will be shorter than the E class at only 22 meters as some people have said in this and other threads?

It seems a real backwards step to me espec ...

I can't believe these pinko commie virtue signalling woke liberals at Vline have spent money on putting artwork on a train. When will this social engineering stop!

[quote=tram1041]I don't think that anything will happen to Camberwell's A class yet,but there is also the question of route 30,will it still exist in the present form and what will run on it or will t ...

The cost of this new depot is said to be $1.7b according to some reports.
bevans
Yikes!

I'm pretty sure that figure was previously announced to be the total cost of 100 new F class tr ...

This seems to make sense with the imminent deployment of E class trams on route 58 since there is a lack of space for them at Essendon depot. YT can run the 57 and 82 from the new depot on Hampstead R ...

Not sure why the politicians are spruiking very modest travel time savings, rather than the key benefit of sending some Geelong trains via Werribee, which is clearly the capacity that will be freed up ...

[quote=Lockie91][quote][quote]Dec 13 TT pushed up till next year.

Not sure if that means the HCMT introduction is also delayed?[/quote]I would assume so considering they apparently can only go one w ...

Dec 13 TT pushed up till next year.

Not sure if that means the HCMT introduction is also delayed?
I would assume so considering they apparently can only go one way around the loop. Loo ...

Posted 15 Oct 2020 15:41 in Victoria by steve195

Has the loop and second platform at Ballan been commissioned as yet?


No.

Shutdown expected in November.

M.

The Vinelander

Pushed back to January I believe

[quote=reubstar6]The Glenhuntly crossings also have been fast tracked. It's interesting that they've gone with rail under as opposed to Skyrail. I would have thought the latter would be more suited to ...

[quote=712M]Is there any update on when this timetable change can be expected to take effect? I am assuming that HCMTs cannot be introduced to service until the timetable has changed, as they can only ...

[quote=ngarner]The delivery of these is going to have to pick up substantially to meet the PPP contract. Evolution are supposed to have 37 7 car units operational by August 2nd 2021, with all 65 deliv ...

My guess is that it allows the tram driver to select their direction of travel before the tram has entered the intersection, that way they won't be blocking Punt rd traffic when they stop the tram to  ...

Oh boy

https://twitter.com/9NewsMelb/status/1159738833329483778

Hopefully when the dust settles the government takes this cons ...

Our transport planning/policy and construction of ismore toll roads is about as logical as air-conditioning at the South Pole.  Hopeless.
Carnot
Unfortunately it seems to be the only thi ...

[quote=gippslander]I don't think we will be seeing VicRoads engineers designing timetables. What is important is that VicRoads will no longer be acting as the State's defacto transport planning agency ...

Honestly though how many tram priority trials are we going to see before full system implementation is considered?
railblogger
They tend to always follow a pretty simple storyline, don't ...

[quote=Adogs][quote]considering the old bridge is a rail bridge, what's happening to it ? ( to bring topic into the rail theme)

regards,

David Head[/quote]

I'm out of the loop, but I thought th ...

It'll be for pedestrians and cyclists.

Posted 11 Dec 2018 18:54 in Melbourne suburban by steve195

In addition, I have always wondered if bike hoops/parkiteer/sheds could be used near popular tram and bus stops.

usedtobered
Doncaster Park & Ride has a Parkiteer

Posted 11 Dec 2018 18:53 in Melbourne suburban by steve195

[quote=Revenue][quote][quote]Revenue, North Brighton is a metro station where people use hand rails near the access lane from bay Street, to chain their bikes up and this creates congestion as this is ...

1 of 11 2 3 ... 9 10 11

Search found 258 matches

Jump to: