5" and 7 1/4" dual points

 
Topic moved from Help For Beginners by dthead on 05 Apr 2021 21:54
  goodlife Beginner

Help required please.  I have a large trackwork in 2 loops, one 5" and one 7 1/4" .  I am now wishing to make the 5" into a dual gauge with the 7 1/4".  Trackwork is no problem but I need assistance with point work.  A clear photo or drawing of a dual gauge point would be very much appreciated.
Regards
Barry

Sponsored advertisement

  Graham4405 The Ghost of George Stephenson

Location: Dalby Qld
Help required please.  I have a large trackwork in 2 loops, one 5" and one 7 1/4" .  I am now wishing to make the 5" into a dual gauge with the 7 1/4".  Trackwork is no problem but I need assistance with point work.  A clear photo or drawing of a dual gauge point would be very much appreciated.
Regards
Barry
goodlife
I suggest that you post this in the Australian Miniature Railways forum, you're more likely to get the answers you are seeking there.
  kitchgp Chief Commissioner

There are pictures and diagrams of dual-gauge and triple-gauge turnouts and transitions in South Australia's Mixed Gauge Muddle publication on the National Rail Museum's website:
http://nrm.org.au/assets/pdfdocs/collections/multi-gauge-muddle.pdf
  goodlife Beginner

Help required please.  I have a large trackwork in 2 loops, one 5" and one 7 1/4" .  I am now wishing to make the 5" into a dual gauge with the 7 1/4".  Trackwork is no problem but I need assistance with point work.  A clear photo or drawing of a dual gauge point would be very much appreciated.
Regards
Barry
I suggest that you post this in the Australian Miniature Railways forum, you're more likely to get the answers you are seeking there.
Graham4405
Thanks Graham, will do. Barry

Sponsored advertisement

Subscribers: goodlife

Display from: