WN51 clarifies a few things at Liverpool:
* North Transit road has 2 signals and appears to be long enough to allow a Down Train to clear the Down Main at 260 points while an Up Train is leaving P2 or P3. Km of 260B points not shown, so exact calc not possible.
*** However a RP-er will need to witness this en order to be sure.
* South Transit Road has catchpoints, etc., and might be useable for stabling of one train,
* Down Train can arrive in P3 via 265R while Up train is leaving P2 (simultaneous move, like existing).
* Signal LL205 has a (miniature?) co-acting Junction Repeater, which may be a first.
* Two ways of terminating a Down train in P3, via 260R or 265R points. (Variety is the spice of life)
* Several signals have preliminary mediums (pulsating lower Yellows) (because signal spacing has been reduced).
Edited 06 Jan 2014 22:38, 8 years ago, edited by awsgc24
WN51 clarifies a few things at Liverpool:
* North Transit road has 2 signals and appears to be long enough to allow a Down Train to clear the Down Main at 260 points while an Up Train is leaving P2 or P3. Km of 260B points not shown, so exact calc not possible.
* South Transit Road has catchpoints, etc., and might be useable for stabling of one train,
* Down Train can arrive in P3 via 265R while Up train is leaving P2 (simultaneous move, like existing).
* Signal LL205 has a (miniature?) co-acting Junction Repeater, which may be a first.
* Two ways of terminating a Down train in P3, via 260R or 265R points. (Variety is the spice of life)
* Several signals have preliminary mediums (pulsating lower Yellows) (because signal spacing has been reduced).
Edited 04 Jan 2014 23:46, 8 years ago, edited by awsgc24
WN51 clarifies a few things at Liverpool:
* North Transit road has 2 signals and appears to be long enough to allow a Down Train to clear the Down Main at 260 points while an Up Train is leaving P2 or P3. Km of 260B points not shown, so exact calc not possible.
* The South Transit Road has catchpoints, etc., and might be useable for stabling of one train,
* Down Train can arrive in P3 via 265R while Up train is leaving P2 (simultaneous move).
* Signal LL205 has a (miniature?) co-acting Junction Repeater, which may be a first.
* Two ways of terminating a Down train in P3, via 260R or 265R points.
* Several signals have preliminary mediums (pulsating lower Yellows).
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2022 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.2729s | RAM: 5.95kb