NORTH STRATHFIELD
The dive at North Strathfield is making good progress.
Walls are protected by temporary wooden fences.
Once the dive reaches structure gauge height there are cross braces across the tracks, like at Chatswood.
CONCORD
The new concrete stairs and overhead concourse are also making good progress, as well as the new Platform 1/2.
A twenty four shipping container on P2 has been modified to act as a waiting room, with two seats inside.
CHELTENHAM-THORNLEIGH
Considerable progress has been made in excavating cuttings for the third track, and concreting the cutting walls, which can be quite tall.
Edited 11 Apr 2014 18:28, 8 years ago, edited by awsgc24
NORTH STRATHFIELD
The dive at North Strathfield is making good progress.
Falls are protected by temporary wooden fences.
CONCORD
The new concrete stairs and overhead concourse are also making good progress, as well as the new Platform 1/2.
A twenty four shipping container on P2 has been modified to act as a waiting room, with two seats inside.
CHELTENHAM-THORNLEIGH
Considerable progress has been made in excavating cuttings for the third track, and concreting the cutting walls, which can be quite tall.
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2022 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.4305s | RAM: 5.73kb