The Ring Road needed to be completed, I just don't agree to the option they've chosen (or the funding model). Had it connected up with Eastlink east of the tunnels, it would have been a far more effective solution.
…………………………………………………………………………………………………..
As has been pointed out by numerous others, this was probably the worst option. It’s turned NE Link into a Greensborough – City freeway rather than filling in the missing link between the Ring Road and Eastlink. However one suspects that Eastlink’s current owner would have been pedalling furiously in the background. The other options would have bypassed its tunnels with the consequential significant loss of revenue. It wants full tunnels, even if they are clogged with traffic. Another casualty of privatisation.
Edited 10 Feb 2019 21:26, 2 years ago, edited by kitchgp
The Ring Road needed to be completed, I just don't agree to the option they've chosen (or the funding model). Had it connected up with Eastlink east of the tunnels, it would have been a far more effective solution.
…………………………………………………………………………………………………..
As has been pointed out by numerous others, this was probably the worst option. It’s turned NE Link into a Greensborough – City freeway rather than filling in the missing link between the Ring Road and Eastlink. However one suspects that Eastlink’s current owner would have been pedalling furiously in the background. The other options would have bypassed its tunnels with the consequential significant loss of revenue. It wants full tunnels, even if they are clogged with traffic. Another casualty of privatisation.
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.3759s | RAM: 5.76kb