Plenty Road track maintenance
Read 17-minute stories and join #onboardbookclub
E-Class trams on Route 11 & new passenger info displays - all part of improving Melbourne’s tram network
Infrastructure Tasmania boss Allan Garcia considers new bridge and light rail projects
Nalder finds light rail ‘unviable’
New East Brunswick tram terminus being built in second phase of Route 96 upgrade
Prime Minister Tony Abbott uses ACT light rail project as example of how to fund public transport
Man injured while working on light rail network in Sydney's CBD
Fuel cell tram framework agreement
Adelaide tram drivers to stop work
The line has a single elevated guideway with a passing loop in Lazzaretto, near the control centre and a maintenance depot.
The line has three stations and offers an end-to-end journey time of 7min 30s, with a capacity of 570 passengers per hour per direction. The shuttle is expected to carry one million passengers in its first year.
The line was originally scheduled to open on March 7, but was delayed due to the coronavirus pandemic. A reduced service with restricted vehicle occupancy will initially be operated due to social distancing requirements and the low demand for air travel.
The line has three stations at Bologna Central, Lazzaretto and the airport.
Services will be operated by a fleet of three 18m-long three-section rubber-tyred driverless trains with a capacity of 70 passengers each and a maximum speed of 80km/h, supplied by Intamin Transportation, Switzerland. The trains are equipped with solar panels, which are expected to reduce energy consumption by up to 35%, potentially reducing CO2 emissions by up to 300 tonnes annually.
Two trains will be used at a time for regular services, but during periods of high demand, two of the vehicles can be operated as a coupled pair. A fourth vehicle is being considered in future to accommodate growth in demand.
Construction of the Marconi Express line began in October 2015 and was completed in 2019, for a total cost of €125m. The main civil works contractor was Mate, Italy, with Intamin providing the guideway, vehicles, power supply and platform screen doors for the project. STS Bologna carried out engineering design, Iosa Ghini Associates was the lead architect, and Steer served as a consultant.
For detailed data on light rail projects from around the world, subscribe to IRJ Pro.
The post Bologna opens Marconi Airport peoplemover appeared first on International Railway Journal.
This article first appeared on www.railjournal.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 1.1733s | RAM: 6.41kb