Trains ordered for Busan metro Line 1
CRRC to supply Noida metro trains
Jakarta – Bandung DBOM concession agreed
Myanma Railways orders Indian locomotives
DBK-Leasing completes Ijara wagon deal
Bangkok railway engineering education agreement signed
Singapore sovereign wealth fund takes stake in Railpool
Bangkok monorail lines approved
Contactless ticketing to be tested in Singapore
The trials will take place in October and November 2021 using an out–of–service 12-car train on the 5km stretch between Niigata station and the Niigata Shinkansen vehicle depot. The ATO trials will consist of remote departure, tests of the ATO system to automatically accelerate and decelerate the train, automatic stopping in a pre-determined location, and emergency stop procedures.
JR East will also test the use of local 5G infrastructure to transmit high-definition video in real-time, which will support verification of the use of 5G in railways. JR East will install a base station along the line to support the transmission test and the capability to perform large-capacity, low-delay communication.
JR East says experience from these trials will support the wider deployment of ATO across its Shinkansen network, a policy included in the railway’s Transformation 2027 strategy.
The post JR East to trial ATO and 5G on Joetsu Shinkansen appeared first on International Railway Journal.
This article first appeared on www.railjournal.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 0.9555s | RAM: 6.37kb