Trains ordered for Busan metro Line 1
CRRC to supply Noida metro trains
Jakarta – Bandung DBOM concession agreed
Myanma Railways orders Indian locomotives
DBK-Leasing completes Ijara wagon deal
Bangkok railway engineering education agreement signed
Singapore sovereign wealth fund takes stake in Railpool
Bangkok monorail lines approved
Contactless ticketing to be tested in Singapore
Ulaanbaatar Railway took delivery of two more TEM18DM diesel shunting locomotives from Transmashholding subsidiary Bryansk Engineering Plant on October 22.
Under a contract signed in 2019, Bryansk is due to supply 10 TEM18DMs and 14 2TE25KM two-section diesel locomotives for main line freight services. All are due to be delivered by mid-2021. The national railway already has 15 TEM18DMs delivered in 2011-19 and 15 2TE25KMs supplied in 2017-20.
Owned jointly by the governments of Mongolia and Russia, with the Russian stake managed by RZD, the 1 520 mm gauge Ulaanbaatar Railway reported a total freight volume of 27 million tonnes in 2019, a 4% increase on the previous year.
This article first appeared on www.railwaygazette.com
About this website
Railpage version 3.10.0.0037
All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest is © 2003-2021 Interactive Omnimedia Pty Ltd.
You can syndicate our news using one of the RSS feeds.
Stats for nerds
Gen time: 2.3133s | RAM: 6.34kb